BLD-Final | 1/27/2015 | 1/28/2015 | 1/28/2015 | A | PASS |
Dave Hannah
|
|
|
Derrick Phone #: ###-#### ok for perm occ
|
BLD-Final | 12/2/2014 | 12/2/2014 | 12/2/2014 | P | PART |
Dave Hannah
|
|
|
###-#### Derick ok for temp occ
|
FIRE-Final Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Conference | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | DONE |
Troy Cobbley
|
|
|
I spoke with Tom Gainer about the non-functional fire alarm panel and that the Liquor Store stocking shelves. I spoke with the Liquor Store manager about needing Boise Fire Dept permission to fire load the store prior to a inspection/sign off.
|
FIRE-Final Inspection | 11/28/2014 | 11/28/2014 | 11/28/2014 | P | FAIL |
Forrest France
|
|
|
Project is not in condition for final approval at this time. Noted several items including; missing panic hardware at the meeting room exit doors per plan, post max. occupant signage, provide second exit sign/EM light at the meeting room per plan, missing ceiling tile throughout, provide approved hardware at the restroom door, repair exit discharge light at the alley way, missing hardware at the second exit from meeting room, post fire extinguishers per plan, project related fire sprinkler permit is not yet finaled, remove non-applicable suite address numbers, blank or disable keyed deadbolt above panic hardware main entry/exit.
|
BLD-Framing/Rough-in | 11/13/2014 | 11/14/2014 | 11/14/2014 | A | PASS |
Dave Hannah
|
|
|
Derek Phone #: ###-####
|