BLD-Aging Inspection | 6/26/2020 | 6/26/2020 | 6/30/2020 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/9/2020 | 3/9/2020 | 3/12/2020 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/11/2019 | 11/11/2019 | 11/14/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/12/2019 | 8/12/2019 | 8/19/2019 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 6/10/2019 | 6/10/2019 | 6/13/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/29/2019 | 3/29/2019 | 4/4/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/9/2019 | 1/9/2019 | 1/9/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/29/2018 | 10/29/2018 | 11/2/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/13/2018 | 7/13/2018 | 7/18/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/23/2018 | 4/23/2018 | 5/1/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/19/2018 | 2/19/2018 | 2/20/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/18/2017 | 12/18/2017 | 12/19/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 10/16/2017 | 10/16/2017 | 10/16/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/16/2017 | 8/16/2017 | 8/23/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 6/16/2017 | 6/16/2017 | 6/20/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/28/2017 | 3/28/2017 | 3/28/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/26/2017 | 1/26/2017 | 1/27/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 11/15/2016 | 11/15/2016 | 11/21/2016 | P | PEND |
Dave Hannah
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Final | 11/17/2016 | 11/18/2016 | 11/19/2016 | P | PEND |
Dave Hannah
|
|
|
Building final Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok for temp occ but needs to fix ada issues
|
BLD-Final | 11/16/2016 | 11/16/2016 | 11/16/2016 | A | NR |
Dave Hannah
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/15/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place, addressing will be installed when recieved as well as stairwell signage (verified install payment be contractor invoice, signs will be installed when recieved) Final life fire safety inspection passed/complete.
|
BLD-Final | 11/8/2016 | 11/10/2016 | 11/9/2016 | A | CANC |
Dave Hannah
|
|
|
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Zaccheo
|
FIRE-Final Inspection | 11/8/2016 | 11/9/2016 | 11/9/2016 | A | CANC |
Troy Cobbley
|
|
|
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Zaccheo
|
BLD-Final | 10/28/2016 | 10/31/2016 | 11/1/2016 | P | NR |
Dave Hannah
|
|
|
Final after Fire/Life/Safety Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
FIRE-Final Inspection | 10/28/2016 | 10/31/2016 | 10/31/2016 | A | CANC |
Katie Marron
|
|
|
No inspection completed. Waiting to do in conjunction with Fire Alarm Final.
|
BLD-Final | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | CANC |
Dave Hannah
|
|
|
Final after Fire/Life/Safety inspection. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD-Conference | 10/19/2016 | 10/19/2016 | 10/19/2016 | A | PASS |
Dave Hannah
|
|
|
Handrail compliance. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Dave Hannah
|
|
|
6th floor corridor ceiling grid inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 9/27/2016 | 9/28/2016 | 9/28/2016 | A | PASS |
Dave Hannah
|
|
|
Fifth floor corridor ceiling grid inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 9/20/2016 | 9/21/2016 | 9/21/2016 | A | PASS |
Dave Hannah
|
|
|
Ceiling grid inspection 4th floor corridor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 9/7/2016 | 9/7/2016 | 9/8/2016 | P | PASS |
Dave Hannah
|
|
|
Hole patches to enclose utility shaft levels 3 thru 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 8/31/2016 | 9/1/2016 | 9/1/2016 | P | PASS |
Dave Hannah
|
|
|
Ceiling grid level 3 corridor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 8/31/2016 | 9/1/2016 | 9/1/2016 | P | PASS |
Dave Hannah
|
|
|
Shaft wall trash/recycle and closure of utility shaft wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 8/23/2016 | 8/23/2016 | 8/24/2016 | P | PASS |
Dave Hannah
|
|
|
Shaft wall, level 3 trash/recycle room. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 8/24/2016 | 8/24/2016 | 8/24/2016 | A | PASS |
Dave Hannah
|
|
|
Shaft wall, level 3 trash/recycle room. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 8/16/2016 | 8/16/2016 | 8/16/2016 | P | PASS |
Mike Jordan
|
|
|
Lobby framing inspection Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Dave Hannah
|
|
|
Framing hard lids ; fire caulking above hard lids in corridors 5 ; 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 7/30/2016 | 8/1/2016 | 8/5/2016 | P | PASS |
Dave Hannah
|
|
|
Drop soffit framing 3rd and 4th floor corridors. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Conference | 7/25/2016 | 7/27/2016 | 7/27/2016 | A | DONE |
Dave Hannah
|
|
|
Meeting with 119 owners group concerning A.D.A. compliance in unit 301. Owners will be on site between 9 a.m. and noon. If you can schedule your visit between those hours it would be appreciated. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PASS |
Dave Hannah
|
|
|
Re- inspection drop ceiling 604 and inspection drop ceiling 605 Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Conference | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | CANC |
Dave Hannah
|
|
|
Re-inspection of unit 604 drop ceiling. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | PART |
Dave Hannah
|
|
|
Drop ceiling inspection units 602, 604, ; 605. Phone #: ###-#### Inspection requested via web by Michael Zaccheo 602 ok
|
BLD-Ceiling Grid Inspection | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Jim Storey
|
|
|
Drop ceiling inspection unit 603. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | PASS |
Dave Hannah
|
|
|
Unit 601 drop ceiling framing and fire caulking. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 7/1/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Dave Hannah
|
|
|
5th floor trash/recycle room shaft wall assembly. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 6/30/2016 | 6/30/2016 | 7/1/2016 | P | CANC |
Dave Hannah
|
|
|
5th floor trash/recycle room shaft wall assembly. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 6/27/2016 | 6/28/2016 | 6/29/2016 | P | PASS |
Dave Hannah
|
|
|
Drop ceiling framing and fire caulking units 505 thru 507. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Conference | 6/24/2016 | 6/24/2016 | 6/24/2016 | P | PASS |
Mike Jordan
|
|
|
Fire drywall at exterior west wall at gussets. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 6/21/2016 | 6/22/2016 | 6/23/2016 | P | PASS |
Dave Hannah
|
|
|
Drop ceiling framing and fire caulking units 501 thru 504. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 6/14/2016 | 6/15/2016 | 6/15/2016 | A | PASS |
Dave Hannah
|
|
|
Hard lid and fire caulking units 406 ; 407. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Mike Jordan
|
|
|
Ceiling grid and fire caulking on level 4, units 401 thru 405 Phone #: ###-#### Inspection requested via web by Michael Zaccheo. Fire caulking complete at floor ceiling penetrations at all drop ceiling locations in rooms 401 to 405.
|
BLD-Energy code compliance | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Mike Jordan
|
|
|
Energy code compliance all of level 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/31/2016 | 6/3/2016 | 6/3/2016 | P | NR |
Dave Hannah
|
|
|
Energy code compliance level 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 5/31/2016 | 6/2/2016 | 6/3/2016 | A | PASS |
Dave Hannah
|
|
|
Foam and framing inspection all of level 6 Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/30/2016 | 5/31/2016 | 6/1/2016 | P | PASS |
Dave Hannah
|
|
|
Energy code compliance west corridor exterior walls level''s 4, 5, ; 6. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 5/30/2016 | 5/31/2016 | 5/31/2016 | P | CANC |
Dave Hannah
|
|
|
Foam and framing 6th floor. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 5/20/2016 | 5/24/2016 | 5/25/2016 | P | PASS |
Dave Hannah
|
|
|
Cover inspection area 2 floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to cover thrid floor soffits
|
BLD-Ceiling Grid Inspection | 5/20/2016 | 5/23/2016 | 5/23/2016 | P | FAIL |
Dave Hannah
|
|
|
Cover inspection area 1 floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PASS |
Dave Hannah
|
|
|
Energy code compliance northwest stairwell. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/17/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Dave Hannah
|
|
|
Energy compliance in area 2 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/12/2016 | 5/12/2016 | 5/13/2016 | P | PASS |
Dave Hannah
|
|
|
Energy code compliance in area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 5/11/2016 | 5/12/2016 | 5/13/2016 | P | PASS |
Dave Hannah
|
|
|
Foam and framing in area 2 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PEND |
Dave Hannah
|
|
|
Energy code compliance in area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 5/9/2016 | 5/10/2016 | 5/11/2016 | P | PASS |
Dave Hannah
|
|
|
Foam And framing inspection area 1 on level 5. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 4/28/2016 | 4/28/2016 | 4/29/2016 | P | PASS |
Dave Hannah
|
|
|
Energy code compliance area 2 on level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 4/26/2016 | 4/27/2016 | 4/27/2016 | A | PASS |
Dave Hannah
|
|
|
Foam sealant, shear wall, and rough framing area 2 on level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 4/25/2016 | 4/26/2016 | 4/26/2016 | P | CANC |
Dave Hannah
|
|
|
Foam and framing inspection area 2 on level 4. I have the city set on site now. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD-Energy code compliance | 4/20/2016 | 4/20/2016 | 4/21/2016 | P | PASS |
Dave Hannah
|
|
|
Exterior wall insulation area 1 level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 4/19/2016 | 4/19/2016 | 4/20/2016 | P | PASS |
Dave Hannah
|
|
|
Foam and framing inspection area 1 level 4. Please check with Mechanical inspector before arrival. He is also scheduled for PM inspection to cover. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | DONE |
Dave Hannah
|
|
|
Sheer wall nailing on exterior of north wall. MTI to inspect late morning as well. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 4/12/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Dave Hannah
|
|
|
Energy compliance for area 2 (units 4,5,6, 7) on floor 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 4/11/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Dave Hannah
|
|
|
Foam insulation in area 2 (units 4, 5, 6, 7) on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 4/11/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Dave Hannah
|
|
|
Framing, and sheer wall in area 2 (units 4, 5, 6, 7) on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Dave Hannah
|
|
|
Fire block for area 1 (units 301, 302, 303) on 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 4/4/2016 | 4/5/2016 | 4/7/2016 | P | PASS |
Dave Hannah
|
|
|
Framing and sheer-wall in area 1 on the 3rd floor. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 4/5/2016 | 4/6/2016 | 4/7/2016 | P | PASS |
Dave Hannah
|
|
|
Exterior wall insulation for energy compliance in area 1 on level 3. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Dave Hannah
|
|
|
Sheer wall nailing in 5th floor corridor and stairs. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Conference | 3/22/2016 | 3/22/2016 | 3/23/2016 | P | DONE |
Dave Hannah
|
|
|
Conference on drop ceiling 2 hr assembly. If possible, please call 30 minutes in advance of arrival. Thanks. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PART |
Dave Hannah
|
|
|
2 hr wall assembly @ trash and recycle shaft Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | 3/17/2016 | P | PART |
Dave Hannah
|
|
|
Framing and 2hr assembly Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | 3/16/2016 | A | NR |
Dave Hannah
|
|
|
Framing and 2hr assembly Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 3/15/2016 | 3/15/2016 | 3/15/2016 | A | CANC |
Dave Hannah
|
|
|
2 hr shaft wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo work inprogress
|
BLD-Framing/Rough-in | 3/9/2016 | 3/10/2016 | 3/10/2016 | A | PASS |
Dave Hannah
|
|
|
South side of roof for roof sheet nailing. Contact on site tomorrow will be Jack Lunsford ###-#### Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/8/2016 | 3/9/2016 | 3/9/2016 | P | PART |
Dave Hannah
|
|
|
Roof sheet nailing inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to cover north half
|
BLD-Wall cover | 3/4/2016 | 3/7/2016 | 3/8/2016 | A | PASS |
Dave Hannah
|
|
|
Sheer wall inspection on the West wall adjacent to the Safari Inn. Will have MTI inspection on same wall @ 11:00 a.m. as well. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/4/2016 | 3/7/2016 | 3/8/2016 | P | PART |
Dave Hannah
|
|
|
Roof sheeting nailing on North side of foot print. Phone #: ###-#### Inspection requested via web by Michael Zaccheo north west corner
|
BLD-Conference | 2/22/2016 | 2/23/2016 | 2/24/2016 | P | DONE |
Dave Hannah
|
|
|
Fire rated drywall boxes for can lights. Please call approximately 30 minutes before arrival so all concerning parties can be present. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Conference | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | PASS |
Dave Hannah
|
|
|
Shear wall inspection on 3rd floor corridor and 6th floor west wall. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 2/2/2016 | 2/3/2016 | 2/4/2016 | A | PART |
Dave Hannah
|
|
|
would like call ahead; Jack Phone #: ###-#### ok to cover lids in corradors
|
BLD-Wall cover | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PART |
Dave Hannah
|
|
|
Two hour shaft drywall inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 1/4/2016 | 1/5/2016 | 1/5/2016 | P | PART |
Dave Hannah
|
|
|
Drywall inspection for shaft walls. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 1/1/2016 | 1/4/2016 | 1/4/2016 | P | CANC |
Dave Hannah
|
|
|
Shaft wall drywall inspection. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD-Framing/Rough-in | 12/30/2015 | 12/31/2015 | 12/31/2015 | A | PART |
Dave Hannah
|
|
|
Inspection of 3rd and 4th floor framing of 2 hr. shaft walls for drywall on interior side of shafts. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to start rocking
|
BLD-Framing/Rough-in | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | PASS |
Dave Hannah
|
|
|
Inspection for application of Durock on 2 hour exterior wall next to Safari Inn. MTI is inspecting the sheer-wall portion @ 8 a.m. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 11/11/2015 | 11/12/2015 | 11/12/2015 | A | PART |
Dave Hannah
|
|
|
For 1 hr. firewall @ Northwest corner, 3rd floor, next to Safari Inn. Phone #: ###-#### Inspection requested via web by Michael Zaccheo ok to stand wall
|
BLD-Framing/Rough-in | 11/6/2015 | 11/6/2015 | 11/9/2015 | P | NR |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 11/4/2015 | 11/5/2015 | 11/5/2015 | P | CANC |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Will reschedule for tomorrow. Contractor looking for meeting with framers.
|