BLD-Final | 8/25/2015 | 8/25/2015 | 8/25/2015 | A | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 8/20/2015 | 8/21/2015 | 8/21/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety inspection passed/complete
|
BLD-Conference | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-####
|
BLD-Final | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### temp ok pending others
|
FIRE-Final Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | FAIL |
Troy Cobbley
|
|
|
Fire life safety will be ok to pass when the project related fire alarm and fire sprinkler permits are finaled
|
FIRE-Final Inspection | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | CANC |
Jim Page
|
|
|
Tom Phone #: ###-####
|
BLD-Conference | 6/17/2015 | 6/18/2015 | 6/18/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Murphy ramps ok
|
BLD-Footing | 12/9/2014 | 12/9/2014 | 12/9/2014 | A | PASS |
Jim Storey
|
|
|
Concrete placement on 11/25 has been supported with engineering stamped documents from the engineer of record and engineer/owner of special inspection firm.
|
BLD-Foundation | 12/1/2014 | 12/2/2014 | 12/2/2014 | P | NR |
Jim Storey
|
|
|
Brian Phone #: ###-#### si nr
|
BLD-Foundation | 11/24/2014 | 11/25/2014 | 11/25/2014 | A | FAIL |
Jim Storey
|
|
|
Bryan Phone #: ###-#### placment half done upon ariving for insp special insp. on site. Rebar clearance no achived/ stopped placment required engineer of record and special insp to resolve isue and provide field reports from both to meet code and engineered design.
|
BLD-Foundation | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | CANC |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
BLD-Footing | 10/30/2014 | 10/30/2014 | 10/30/2014 | P | PART |
Jim Storey
|
|
|
Brian Phone #: ###-#### rebar ok pending reports/ soil value aproved by engineers of record si verifacation ok.
|