BLD-Final | 3/27/2015 | 3/27/2015 | 3/27/2015 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 3/25/2015 | 3/26/2015 | 3/26/2015 | A | PART |
Mike Jordan
|
|
|
Pat Phone #: ###-####. Ok for temp occ. Will be ok for pwerm occ. once zoning signs perm.
|
BLD-Final | 3/25/2015 | 3/25/2015 | 3/25/2015 | P | NR |
Mike Jordan
|
|
|
Pat Phone #: ###-####. Needs mech. final. scheduled for tomorrow in the am.
|
FIRE-Final Inspection | 3/24/2015 | 3/25/2015 | 3/25/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 3/24/2015 | 3/24/2015 | 3/24/2015 | P | FAIL |
Troy Cobbley
|
|
|
Will be ok to final when the project related fire alarm and fire sprinkler permits are finaled.
|
BLD-Other | 2/20/2015 | 2/20/2015 | 2/20/2015 | P | PASS |
Mike Jordan
|
|
|
sheet rock // Pat Phone #: ###-####
|
BLD-Energy code compliance | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Wall Bracing | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | FAIL |
Mike Jordan
|
|
|
Pat Phone #: ###-####. Nail off all hangars, provide protection for microwave ducts. fireblock at reuturn air upstairs unit, provide adequate strapping on top plates at line sets. Provide truss engineering. Ok to insulate.
|
BLD-Wall Bracing | 2/13/2015 | 2/13/2015 | 2/13/2015 | A | FAIL |
Mike Jordan
|
|
|
Pat Phone #: ###-####. Install all missing floor to floor straps.
|
BLD-Foundation | 12/11/2014 | 12/12/2014 | 12/12/2014 | P | DONE |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Footing | 12/10/2014 | 12/11/2014 | 12/11/2014 | A | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. Footing completed, need revised footing plan showing 16 inch wide footing.
|