Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberBLD14-03070
StatusFinaled
Name BILTMORE COMPANY
Site Address 6033 W OPOHONGA ST
Project NamePalisades Apartments
Customer NumberBLD14-03071
ePlanReviewYes
Description
Palisades Apartments - Building A - To construct a new 23,000 square foot, three story, wood framed, 24 unit multi-family apartment building and related site improvements. This building will have an NFPA 13R sprinkler system. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/29/201612/30/201612/30/2016PPASS
DetailsJim Sly
Cody Phone #: ###-####
FIRE-Final Inspection12/29/201612/30/201612/30/2016APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection12/23/201612/23/201612/23/2016PPART
DetailsTroy Cobbley
Life safety passed in apartments 107, 108, 207, 208, 307 and 308. Waiting on the corrected as-builts for the fire sprinkler system prior to a final sign off.
FIRE-Final Inspection12/19/201612/19/201612/19/2016PPART
DetailsTroy Cobbley
Life safety passed for apartments 105, 106, 205, 206, 305 and 306
BLD-Final12/13/201612/13/201612/13/2016PPART
DetailsMike Jordan
Cody Phone #: ###-####. Ok for
Temp C of O for units 103,104,203,204,303,304 only.
FIRE-Final Inspection12/9/201612/12/201612/12/2016APART
DetailsTroy Cobbley
Life safety passed for apartments 103, 104, 203, 204, 303, 304
FIRE-Final Inspection12/9/201612/9/201612/9/2016PCANC
DetailsJim Page
Inspection request rescheduled.
BLD-Final12/2/201612/2/201612/2/2016PPART
DetailsMike Jordan
Cody Phone #: ###-####. Ok to occupy units 101,102,201,202,301,302 only.
FIRE-Final Inspection11/23/201611/29/201611/29/2016APART
DetailsTroy Cobbley
Life safety passed only for apartments 101, 102, 201, 202, 301, 302.
FIRE-Final Inspection11/16/201611/17/201611/17/2016AFAIL
DetailsTroy Cobbley
Need the project related fire sprinkler and and fire alarm permits addressed prior to an inspection.
BLD-Wall cover10/18/201610/18/201610/18/2016PPASS
DetailsMike Jordan
Cody Phone #: ###-####. Hat channel, 1st and 2nd. floors, north units ok.
BLD-Wall Bracing10/14/201610/17/201610/17/2016PPASS
DetailsMike Jordan
Cody Phone #: ###-####. Hat channel ok.
BLD-Wall cover10/13/201610/14/201610/14/2016APASS
DetailsMike Jordan
Cody Phone #: ###-####. 2nd. floor, hat channel, central corridor, north units.
BLD-Framing/Rough-in10/12/201610/13/201610/13/2016APASS
DetailsMike Jordan
Cody Phone #: ###-####. Hat channel, 1st floor center units, north side.
BLD-Energy code compliance10/10/201610/10/201610/10/2016PPASS
DetailsMike Jordan
1st, 2nd. floors north units ok.
BLD-Energy code compliance10/7/201610/10/201610/10/2016APASS
DetailsMike Jordan
Cody Phone #: ###-####. 1st,2nd and 3rd floors, central corridor, north half. 3rd. floor north end units ok.
BLD-Framing/Rough-in10/6/201610/7/201610/7/2016APASS
DetailsMike Jordan
cody Phone #: ###-####. All framing issues resolved on 1st., 2nd., and 3rd. floors north half of building. Ok to insulate.
BLD-Wall cover10/5/201610/5/201610/5/2016PPASS
DetailsMike Jordan
Cody Phone #: ###-####. 1st. floor hat channel ok.
BLD-Framing/Rough-in10/4/201610/4/201610/4/2016PFAIL
DetailsMike Jordan
Cody Phone #: ###-####. Complete all firestopping, fireblocking. Block and nail off all interior shear walls. Provide UL listed washer box. Provide 2 layers 5/8 type x rock on 1hr. horizontal floor ceiling assembly aboce furnace in ADA apartment.
BLD-Wall cover10/3/201610/4/201610/4/2016APASS
DetailsMike Jordan
Cody// 2nd floor Phone #: ###-####
BLD-Wall cover9/26/20169/28/20169/28/2016PPASS
DetailsMike Jordan
Dry wall // Cody Phone #: ###-####. Unites 107,108,207 and 208.
BLD-Energy code compliance9/23/20169/23/20169/23/2016PPASS
DetailsDave Hannah
Cody Phone #: ###-#### units 103 104 203 204 303 and 304 ok to cover
BLD-Energy code compliance9/22/20169/22/20169/22/2016PPASS
DetailsMike Jordan
Cody Phone #: ###-####. 1st, 2nd, 3rd. floor sother most six units.
BLD-Framing/Rough-in9/19/20169/20/20169/20/2016APASS
DetailsMike Jordan
Cody Phone #: ###-####. Ok to isulate 1st, 2nd. and 3rd floors, south half only.
BLD-Framing/Rough-in9/16/20169/19/20169/19/2016AFAIL
DetailsMike Jordan
Cody Phone #: ###-####
BLD-Framing/Rough-in9/16/20169/16/20169/16/2016PFAIL
DetailsMike Jordan
Cody Phone #: ###-####. See corrections list.
BLD-Wall Bracing8/26/20168/29/20168/29/2016APASS
DetailsMike Jordan
Shear // Cody Phone #: ###-####
BLD-Wall cover8/26/20168/26/20168/26/2016PPASS
DetailsMike Jordan
Cody Phone #: ###-####, SOuth units, 2nd floor fur downs.
BLD-Wall Bracing8/25/20168/25/20168/26/2016PPASS
DetailsMike Jordan
Cody Phone #: ###-####. Ok to rock corridors.
BLD-Other8/23/20168/24/20168/24/2016PPASS
DetailsMike Jordan
RC1 channel; Tony Phone #: ###-####
BLD-Other8/12/20168/12/20168/12/2016PCANC
DetailsMike Jordan
Cody-wall bracing Phone #: ###-####
BLD-Wall Bracing8/12/20168/12/20168/12/2016PFAIL
DetailsMike Jordan
Cody-wall bracing Phone #: ###-####. Missing floor to floor straps and hold downs. Also missing several areas on exterior and interior shear.
BLD-Wall cover5/17/20165/18/20165/18/2016APASS
DetailsMike Jordan
Shear // Pat Phone #: ###-####. south half crawl space.
BLD-Wall Bracing5/3/20165/4/20165/4/2016APASS
DetailsMike Jordan
Pat Phone #: ###-####. 2nd. floor exterior shear, north building.
BLD-Foundation4/27/20164/27/20164/27/2016PPASS
DetailsMike Jordan
Pat Phone #: ###-####. Wall bracing and holdowns in crawl space.
BLD-Foundation2/24/20162/25/20162/25/2016ANR
DetailsMike Jordan
Manul Phone #: ###-####. Contractor not ready.
BLD-Footing2/22/20162/22/20162/22/2016PPASS
DetailsMike Jordan
Manuel Phone #: ###-####