BLD-Final | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-####
|
FIRE-Final Inspection | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 7/23/2015 | 7/23/2015 | 7/23/2015 | P | PART |
Jim Storey
|
|
|
Kevin Phone #: ###-#### final ok pending fire
|
FIRE-Final Inspection | 7/23/2015 | 7/23/2015 | 7/23/2015 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given until the 5" barrel on the fire hydrant is pointed the right way and correct fire dept access signage is provided.
|
BLD-Framing/Rough-in | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | PASS |
Phil Shearer
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | PART |
Jim Storey
|
|
|
Jim Phone #: ###-#### ok to cover exterior
|
BLD-Foundation | 12/17/2014 | 12/18/2014 | 12/18/2014 | P | PART |
Jim Storey
|
|
|
rebar - Jim Phone #: ###-#### placed with si pending reports
|
BLD-Foundation | 12/16/2014 | 12/17/2014 | 12/17/2014 | P | DEFR |
Jim Storey
|
|
|
rebar - Jim Phone #: ###-####
|
Extend Permit 90/180 days | 12/17/2014 | 12/18/2014 | 12/17/2014 | P | CANC |
Jim Storey
|
|
|
rebar - Jim Phone #: ###-####
|
BLD-Concrete | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PART |
Jim Storey
|
|
|
Jim// pour time 11am Phone #: ###-#### si aproval
|