DOC - Permit Finaled | | | 12/23/2015 | | DONE |
|
|
|
|
BLD-Final | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Jim Storey
|
|
|
Please call Dutch 1/2 hr prior to arrival Thank You Phone #: ###-#### Inspection requested via web by Dennis Harmon built per reviewed plan.
|
FIRE-Final Inspection | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Provide the two exit signs per the approved plans prior to a building inspection
|
BLD-Ceiling Grid Inspection | 2/27/2015 | 2/27/2015 | 2/27/2015 | P | PASS |
Jim Storey
|
|
|
Please call Dutch 1/2 hour prior to arrival, Thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon
|
FIRE-Conference | 2/10/2015 | 2/10/2015 | 2/10/2015 | P | DONE |
Forrest France
|
|
|
On site visit regarding exiting requirements, door hardware, fire sprinkler, fire alarm and hood suppression permit work. Need to revise plans to show accurate existing door swing at the kitchen area service exit.
|
BLD-Framing/Rough-in | 2/2/2015 | 2/2/2015 | 2/2/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Dennis Harmon pending hvac aproval duct bath fans
|
BLD-Wall Bracing | 12/19/2014 | 12/22/2014 | 12/22/2014 | A | PASS |
Jim Storey
|
|
|
nail sheer// randey Phone #: ###-####
|
BLD-Framing/Rough-in | 12/19/2014 | 12/19/2014 | 12/19/2014 | P | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####
|