BLD-Final | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | PASS |
Mike Jordan
|
|
|
doesn''t open until 9; Curtis Phone #: ###-####. All issues have been resolved. Ok for prm occ.
|
FIRE-Final Inspection | 7/8/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | NR |
Jim Sly
|
|
|
Nate-fire final to be done AM as well Phone #: ###-#### Need fire final
|
FIRE-Final Inspection | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | CANC |
Troy Cobbley
|
|
|
Per Nate and I's conversation this inspection is to be rescheduled for when the hvac contractor can be on site for the testing of the duct smoke detectors.
|
BLD-Final | 4/7/2015 | 4/7/2015 | 4/7/2015 | A | PART |
Mike Jordan
|
|
|
Ok for temp occ. Needs to remove manual operated flush bolts from inactive leaf and provide single action locking/unlocking or automatic flush bolts. Inactive leaf has had all door hardware removed and perm. locked until new doors arrive.
|
BLD-Final | 4/6/2015 | 4/6/2015 | 4/6/2015 | P | NR |
Mike Jordan
|
|
|
Curtis Phone #: ###-####. Fire/life/safety inspection failed.
|
FIRE-Final Inspection | 4/6/2015 | 4/6/2015 | 4/6/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide panic hardware at the main exit as per approved plans, provide correct annunciator for the duct smoke detector and repair the exit sign at the rear exit. Provide city approved plans.
|
BLD-Conference | 4/3/2015 | 4/3/2015 | 4/3/2015 | P | DONE |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/25/2015 | 3/26/2015 | 3/26/2015 | A | PASS |
Mike Jordan
|
|
|
Curtis Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/23/2015 | 3/24/2015 | 3/24/2015 | P | NR |
Mike Jordan
|
|
|
Curtis Phone #: ###-####. Needs electrical rough in inspection.
|
BLD-Framing/Rough-in | 3/5/2015 | 3/6/2015 | 3/6/2015 | P | PASS |
Phil Shearer
|
|
|
Curtis Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2015 | 2/27/2015 | 2/27/2015 | P | PART |
Phil Shearer
|
|
|
Bruce Phone #: ###-####
|