BLD-Final | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | PASS |
Jim Sly
|
|
|
Frank-pleae call 30 minutes prior to meet Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 9/22/2015 | 9/23/2015 | 9/23/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | NR |
Jim Sly
|
|
|
customer will be there, but call if you need to Phone #: ###-#### Need ACHD P/W Zone and Fire.
|
BLD-Energy code compliance | 6/11/2015 | 6/11/2015 | 6/12/2015 | P | PASS |
Jim Sly
|
|
|
Frank Phone #: ###-####
|
BLD-Framing/Rough-in | 5/26/2015 | 5/28/2015 | 5/28/2015 | P | PASS |
Jim Sly
|
|
|
Shear // Frank Phone #: ###-#### Shear and Framing OK.
|
BLD-Wall Bracing | 4/21/2015 | 4/23/2015 | 4/23/2015 | A | PART |
Jim Sly
|
|
|
Tim Phone #: ###-#### Should be foundation wall......wall OK.
|
BLD-Footing | 4/21/2015 | 4/22/2015 | 4/22/2015 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
BLD-Conference | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | DONE |
Jim Sly
|
|
|
Frank Phone #: ###-####
|