BLD-Final | 7/27/2016 | 7/28/2016 | 7/28/2016 | A | PASS |
Mike Jordan
|
|
|
Paul Phone #: ###-####. Will be ok for perm occ. once zoning sings perm.
|
BLD-Final | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | NR |
Mike Jordan
|
|
|
Needs zoning final.
|
BLD-Final | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | CANC |
Mike Jordan
|
|
|
Paul Phone #: ###-####.
|
FIRE-Final Inspection | 7/22/2016 | 7/25/2016 | 7/25/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The south east exit sign was non-functional but being replaced when I left. To be tested with the building inspector.
|
BLD-Framing/Rough-in | 2/5/2016 | 2/5/2016 | 2/5/2016 | P | PART |
Mike Jordan
|
|
|
Paul Phone #: ###-####. interior steel stud walls and hardlids ok. Noted that transfer shower does not have the required 48 inch clearance from control wall.
|
BLD-Ceiling Grid Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | CANC |
Mike Jordan
|
|
|
Paul Phone #: ###-####
|
BLD-Framing/Rough-in | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | PASS |
Mike Jordan
|
|
|
Paul Phone #: ###-####. Ok to rock ceiling only.
|
BLD-Wall Bracing | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | PASS |
Mike Jordan
|
|
|
Paul Phone #: ###-####
|
BLD-Foundation | 2/19/2015 | 2/20/2015 | 2/20/2015 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|
BLD-Footing | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Mike Jordan
|
|
|
Jeff-rebar Phone #: ###-####. Will have special inspection. perimeter footing ok.
|