BLD-Ceiling Grid Inspection | 7/13/2017 | 7/14/2017 | 7/14/2017 | A | PASS |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
BLD-Final | 7/11/2017 | 7/12/2017 | 7/12/2017 | A | NH |
Jim Sly
|
|
|
Kelly Phone #: ###-#### Called Kelly 3 times....... Return call when I was out of time to meet him. Re-call for final.
|
FIRE-Final Inspection | 7/11/2017 | 7/11/2017 | 7/11/2017 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspections are complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | CANC |
Troy Cobbley
|
|
|
Kelly did not have approved plans. Phone #: ###-####
|
BLD-Aging Inspection | 1/29/2016 | 1/29/2016 | 2/1/2016 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/28/2016 | 1/28/2016 | 2/1/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 10/26/2015 | 10/27/2015 | 10/27/2015 | A | DONE |
Dave Hannah
|
|
|
Phil Phone #: ###-####
|
BLD-Final | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by phil doble first phase ok
|
BLD-Final | 9/11/2015 | 9/11/2015 | 9/11/2015 | A | NR |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by phil doble
|
FIRE-Final Inspection | 9/11/2015 | 9/11/2015 | 9/11/2015 | A | PART |
Jim Page
|
|
|
Project being completed in phases, inspected areas requesting final, area's for this phase passed/complete for llife fire safety. Contractor will schedule remaining area to inspect when complete.
|
BLD-Ceiling Grid Inspection | 8/20/2015 | 8/20/2015 | 8/20/2015 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by phil doble
|
BLD-Wall cover | 7/1/2015 | 7/1/2015 | 7/1/2015 | A | PASS |
Dave Hannah
|
|
|
Inspection requested via web by phil doble
|
BLD-Wall cover | 6/12/2015 | 6/12/2015 | 6/12/2015 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by phil doble
|
BLD-Conference | 5/15/2015 | 5/15/2015 | 5/15/2015 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by phil doble. Inspected and discussed placement of vault door.
|
BLD-Footing | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | PART |
Dave Hannah
|
|
|
before 2:30 pm. would work best for us. thanks Phil Phone #: ###-#### Inspection requested via web by phil doble strata on site covering spec. inspection.
|