BLD-Final | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PASS |
Phil Shearer
|
|
|
Kevin Phone #: ###-####
|
DOC - Permit Finaled | | | 10/9/2015 | | DONE |
|
|
|
per Final inspection 10-9-15
|
FIRE-Final Inspection | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | FAIL |
Phil Shearer
|
|
|
Kevin Phone #: ###-####. Door swing into path of egress.
|
FIRE-Final Inspection | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PART |
Troy Cobbley
|
|
|
Given a temporary for life safety until the north exit discharge light to be repaired.
|
FIRE-Final Inspection | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | FAIL |
Troy Cobbley
|
|
|
Need all small documents, need new location of the fire hydrant approved, need exit discharge light on north end of building repaired. Need the project related fire alarm and fire sprinkler permits finaled.
|
BLD-Foundation | 5/26/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Phil Shearer
|
|
|
Kevin-rebar-later in the PM if possible Phone #: ###-####
|
BLD-Other | 5/8/2015 | 5/11/2015 | 5/11/2015 | P | PASS |
Phil Shearer
|
|
|
panel steel; Kevin Phone #: ###-#### Pending MTI inspection
|
BLD-Footing | 5/4/2015 | 5/5/2015 | 5/5/2015 | A | PASS |
Phil Shearer
|
|
|
11 pour // Kevin Phone #: ###-####
|
BLD-Footing | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
Phil Shearer
|
|
|
Kevin Phone #: ###-#### Footinf West half of building
|
BLD-Footing | 4/10/2015 | 4/13/2015 | 4/13/2015 | A | PASS |
Phil Shearer
|
|
|
Kevin// pour time 130pm Phone #: ###-####. Interior column footings
|
BLD-Footing | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | NR |
Phil Shearer
|
|
|
Kevin-rebar-pour time 2:30 Phone #: ###-####
|