BLD-Final | 7/21/2015 | 7/22/2015 | 7/22/2015 | A | DONE |
Tony Young
|
|
|
Josh Phone #: ###-####
|
DOC - Permit Finaled | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/21/2015 | 7/21/2015 | 7/21/2015 | P | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
BLD-Final | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | NR |
Tony Young
|
|
|
Call 30 mins before // Josh Phone #: ###-####, need hillside
|
BLD-Final | 7/2/2015 | 7/2/2015 | 7/2/2015 | P | NR |
Jim Sly
|
|
|
Josh Phone #: ###-#### No approval from Public Works for drainage.
|
BLD-Energy code compliance | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####,, ok to cover
|
BLD-Energy code compliance | 4/29/2015 | 4/30/2015 | 4/30/2015 | P | FAIL |
Tony Young
|
|
|
Josh Phone #: ###-####,, correction not completed
|
BLD-Energy code compliance | 4/28/2015 | 4/29/2015 | 4/29/2015 | P | NR |
Tony Young
|
|
|
Insulation // Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 4/28/2015 | 4/29/2015 | 4/29/2015 | P | NR |
Tony Young
|
|
|
Josh Phone #: ###-####,, correction notice not complete
|
BLD-Framing/Rough-in | 4/24/2015 | 4/27/2015 | 4/27/2015 | A | FAIL |
Mike Jordan
|
|
|
Josh Phone #: ###-####. Nail off all simpson hangars, Nail T22 girder trus on opposite face and provide the additional cluster nailing as per truss engineering, seal all penetrations in OSB on open web floor joist for draft stop, Install all MST 48 floor to floor straps on exterior as shown on sheet A4, install the simpson DTT2 with 1/2" diameter all thread in 2 places at deck to interior floor joist with blocking for lateral. Correction notice posted. ok to insulate.
|
BLD-Framing/Rough-in | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | NR |
Mike Jordan
|
|
|
Josh Phone #: ###-####. Needs to complete airseal prior to framing inspection.
|
BLD-Wall Bracing | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | PASS |
Phil Shearer
|
|
|
Josh Phone #: ###-####
|
BLD-Wall Bracing | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | FAIL |
Tony Young
|
|
|
Josh Phone #: ###-####,, not done per plan
|
BLD-Wall cover | 4/8/2015 | 4/9/2015 | 4/9/2015 | A | DEFR |
Tony Young
|
|
|
Josh Phone #: ###-####
|
BLD-Wall Bracing | 4/8/2015 | 4/8/2015 | 4/8/2015 | P | FAIL |
Tony Young
|
|
|
Josh Phone #: ###-####,, not done
|
BLD-Foundation | 3/3/2015 | 3/3/2015 | 3/3/2015 | P | PART |
Tony Young
|
|
|
Adam Phone #: ###-####,, work in progress,, ok
|
BLD-Wall Bracing | 3/3/2015 | 3/3/2015 | 3/3/2015 | P | NR |
Tony Young
|
|
|
Adam Phone #: ###-####
|
BLD-Footing | 2/27/2015 | 2/27/2015 | 2/27/2015 | P | PART |
Tony Young
|
|
|
Pouring at 2 - Adam Phone #: ###-####
|
BLD-Foundation | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PART |
Tony Young
|
|
|
Wall. Pouring at 1:30 // Adam Phone #: ###-####,, lower section (9-11 ft) of rear wall ok to pour
|
BLD-Footing | 1/28/2015 | 1/28/2015 | 1/29/2015 | P | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-#### back wall ftg only
|
BLD-Footing | 1/23/2015 | 1/23/2015 | 1/23/2015 | P | CANC |
Dave Hannah
|
|
|
Adam Phone #: ###-#### no geo tect soils signoff
|