BLD-Final | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | PASS |
Phil Shearer
|
|
|
Jab Phone #: ###-####
|
FIRE-Final Inspection | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | PASS |
Jim Page
|
|
|
Previously noted items corrected, stairs in place, egress lighting operation. Life fire safety passed/complete
|
BLD-Final | 8/6/2015 | 8/7/2015 | 8/7/2015 | P | PART |
Phil Shearer
|
|
|
Jed Phone #: ###-####. OK for temp
|
FIRE-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | PART |
Troy Cobbley
|
|
|
Temporary occupancy for life safety with Romeo's permission until the correct address is posted and the stairs are installed. One exit discharge light repaired while on site.
|
BLD-Energy code compliance | 7/7/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Jim Sly
|
|
|
Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 7/1/2015 | 7/2/2015 | 7/2/2015 | A | PASS |
Phil Shearer
|
|
|
Jeff Phone #: ###-####
|
BLD-Wall Bracing | 6/23/2015 | 6/24/2015 | 6/24/2015 | A | PASS |
Phil Shearer
|
|
|
Jeff Phone #: ###-####
|
BLD-Other | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | PASS |
Jim Sly
|
|
|
Nail off // Jef Phone #: ###-#### Roof nailing....OK.
|
BLD-Foundation | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PASS |
Phil Shearer
|
|
|
Jeff// pour time is 12pm Phone #: ###-####
|
BLD-Concrete | 4/21/2015 | 4/22/2015 | 4/22/2015 | P | PASS |
Phil Shearer
|
|
|
Jeff// pour time is 2pm Phone #: ###-####
|