Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD14-03500
StatusFinaled
Name WESTMINSTER II
Site Address 3122 E HEARTLEAF CT
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 4286 sq. ft., two story (first story 2452 sq. ft., second story 1834 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 1182 sq. ft. of covered patio’s/porches and 1040 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/19/20158/19/20158/19/2015PPASS
DetailsJim Storey
josh Phone #: ###-#### - call prior to access
DOC - Permit Finaled8/19/20158/19/20158/19/2015PPASS
DetailsJim Storey
BLD-Final6/5/20156/5/20156/5/2015PNR
DetailsJim Storey
Josh Phone #: ###-#### need ele and pw
BLD-Final6/3/20156/4/20156/4/2015ANR
DetailsJim Storey
Josh Phone #: ###-#### ele and pw
BLD-Energy code compliance4/1/20154/1/20154/1/2015PPASS
DetailsJim Storey
josh Phone #: ###-####
BLD-Framing/Rough-in3/30/20153/30/20153/30/2015PPASS
DetailsJim Storey
Josh Phone #: ###-####
BLD-Wall Bracing3/5/20153/6/20153/6/2015APASS
DetailsJim Storey
Josh Phone #: ###-####
BLD-Foundation2/17/20152/17/20152/17/2015PPASS
DetailsJim Storey
Adam Phone #: ###-#### geo-tec letter ok and on file per j willie.
BLD-Footing2/13/20152/13/20152/17/2015PFAIL
DetailsJim Sly
Adam// pour time 2pm Phone #: ###-####
At time I was there for an inspection, Subgrade was not approved. Left the jobsite and waited for a call from Contractor letting me know that subgrade was approved so I could verify and pass. That never happened. Never got a Telephone call. Still need Subgrade approval per Jason Taylor.