BLD-Final | 5/8/2015 | 5/8/2015 | 5/8/2015 | P | PASS |
Dave Hannah
|
|
|
I will be on site all day thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
FIRE-Final Inspection | 5/4/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Troy Cobbley
|
|
|
fire/life safety passed. The two exit discharge lights and two emergency can lights to be repaired prior to a building inspection sign off. Also provide verification to the building inspector that the thumbturn deadbolts provided on the restroom doors meets ADA
|
BLD-Framing/Rough-in | 4/22/2015 | 4/22/2015 | 4/22/2015 | P | PASS |
Jim Storey
|
|
|
soffit cover above cooler box, will be ready by noon, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
BLD-Energy code compliance | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | PASS |
Tony Young
|
|
|
restroom wall insulation only, early after lunch, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
BLD-Energy code compliance | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PART |
Tony Young
|
|
|
above cooler/freezer box ceiling insulation only, early afternoon if possible, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, insulation ok,, ok to one side walls pending trades
|
BLD-Energy code compliance | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Tony Young
|
|
|
Changed inspection to afternoon, interior perimeter wall rigid insulation, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
BLD-Energy code compliance | 4/7/2015 | 4/7/2015 | 4/7/2015 | A | CANC |
Tony Young
|
|
|
interior perimeter wall rigid insulation, thanks Miles Phone #: ###-#### >> Inspection requested via web by Miles Hash Inspection cancelled from web by: Miles Hash
|
BLD-Concrete | 4/2/2015 | 4/3/2015 | 4/3/2015 | A | PART |
Tony Young
|
|
|
Rebar and vapor barrier for expansion slab, pour is at 10:30 am, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
BLD-Energy code compliance | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | CANC |
Tony Young
|
|
|
interior perimeter wall rigid board, after 1:30 thanks Miles Phone #: ###-#### >> Inspection requested via web by Miles Hash Inspection cancelled from web by: Miles Hash
|
BLD-Framing/Rough-in | 3/26/2015 | 3/26/2015 | 3/26/2015 | A | PART |
Tony Young
|
|
|
roof nailing inspection required and truss inspection Phone #: ###-#### Inspection requested via web by Miles Hash,, roof ok
|
BLD-Foundation | 3/13/2015 | 3/13/2015 | 3/14/2015 | P | PEND |
Tony Young
|
|
|
2:00 grout pour, MTI will be on site, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, top grout pour,, ok pending special inspection report
|
BLD-Wall Bracing | 3/12/2015 | 3/13/2015 | 3/13/2015 | P | PART |
Tony Young
|
|
|
2:00 grout pour, MTI will be on site, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, S.I. on site
|
BLD-Wall Bracing | 3/11/2015 | 3/12/2015 | 3/12/2015 | P | PART |
Tony Young
|
|
|
2nd lift grout pour at 2:00pm, MTI will be on site, thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash,, special inspector on site,, work in progress,, pending report
|
BLD-Wall Bracing | 3/11/2015 | 3/11/2015 | 3/11/2015 | P | PASS |
Phil Shearer
|
|
|
2:30 grout pour on the 1st lift, MTI will be on site. thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash. 1st lift OK
|
BLD-Foundation | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PART |
Tony Young
|
|
|
Have a 1:00 pour, MTI will be on site for epoxy, rebar and concrete inspections. Thanks Miles Hash Phone #: ###-#### Inspection requested via web by Miles Hash,, ok pending special inspection report
|
BLD-Footing | 2/25/2015 | 2/26/2015 | 2/26/2015 | P | PASS |
Tony Young
|
|
|
Have a 1:00 pour, MTI will be on site for epoxy, rebar and concrete inspections. Thanks Miles Hash Phone #: ###-#### Inspection requested via web by Miles Hash,, special inspector on site also
|