BLD-Final | 3/23/2015 | 3/24/2015 | 3/24/2015 | A | PASS |
Jim Storey
|
|
|
Call half hour before // David Phone #: ###-####
|
FIRE-Final Inspection | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | PASS |
Forrest France
|
|
|
Verified previous correction items for completion.
|
BLD-Ceiling Grid Inspection | 3/11/2015 | 3/12/2015 | 3/12/2015 | P | PASS |
Jim Sly
|
|
|
David Phone #: ###-####
|
FIRE-Conference | 3/10/2015 | 3/10/2015 | 3/11/2015 | P | DONE |
Troy Cobbley
|
|
|
David and I went over life safety requirements. I noted that an address needs to be posted at the top of the hill/property entrance and door hardware provided. Plan review comments have been modified to show the fuel pump
|
BLD-Framing/Rough-in | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PASS |
Jim Storey
|
|
|
cover // david Phone #: ###-####
|