Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD14-03660
StatusFinaled
Name TBL CONSTRUCTION
Site Address 1201 E FRANKLIN ST
Project NameNew Residence
Customer Number 
ePlanReviewYes
Description
***Plan modification to the engineered shear wall hold downs see attached engineering dated 5-31-2015***Plan Modification to garage area adding a door and moving window to the right. JG***Demo permit on file BLD13-03487*** Permit for the construction of a new 2951 sq. ft., two story (first story 1480 sq. ft., basement is 1471 sq. ft.) single family dwelling with 3 bedrooms, 2 bathrooms, approximately 328 sq. ft. of covered patio’s/porches and 647 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/9/20168/10/20168/10/2016APASS
DetailsPhil Shearer
Home will be open Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
DOC - Permit Finaled8/10/20168/10/20168/10/2016PPASS
DetailsPhil Shearer
BLD-Energy code compliance6/18/20156/18/20156/18/2015PPASS
DetailsDave Hannah
BLD-Wall cover6/17/20156/18/20156/18/2015APASS
DetailsDave Hannah
Corrections will be made today. Call Tim if any issues.

Thank you. Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Framing/Rough-in6/12/20156/12/20156/12/2015PPART
DetailsDave Hannah
Call tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin c/n on site ok to insulate
BLD-Wall Bracing6/3/20156/3/20156/4/2015PPART
DetailsDave Hannah
ok to cover ext but slill needs hold downs installed on inside
BLD-Conference6/3/20156/3/20156/3/2015PPASS
DetailsDave Hannah
Call Lucas if any problems. Lucas will be onsite.

Thank you much. Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Wall Bracing5/22/20155/22/20155/22/2015PNR
DetailsJim Storey
Shear only. Framers are on site. Call if any problems

Thanks much. Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin not built per aproved pan or engineering.
BLD-Wall Bracing5/20/20155/20/20155/21/2015PFAIL
DetailsDave Hannah
Re inspection for shear panels. Framing crew and siding crew are on site

Thank you much. Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Wall Bracing5/18/20155/18/20155/18/2015PFAIL
DetailsPhil Shearer
plans are hanging inside the closet near the front door. Call Tim if any problems. Thank you much Phone #: ###-#### Inspection requested via web by Timothy Beaudoin. Missing hold downns, Shear nailing wrong CN posted
BLD-Wall Bracing5/8/20155/8/20155/8/2015AFAIL
DetailsDave Hannah
Shear inspection. gate code is 1201

Call Tim if any issues. Thank you. Phone #: ###-#### Inspection requested via web by Timothy Beaudoin no plans on site
BLD-Foundation4/8/20154/8/20154/9/2015PPASS
DetailsDave Hannah
Phone #: 6971241 >> Inspection requested via mobile web by Heron
BLD-Footing4/7/20154/7/20154/7/2015PPASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing4/6/20154/6/20154/7/2015PNR
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Foundation2/8/20152/9/20152/10/2015PPASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing1/30/20151/30/20151/30/2015PPASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing1/28/20151/29/20151/30/2015ACANC
DetailsDave Hannah
Heron Phone #: ###-####
BLD-Footing1/30/20151/30/20151/30/2015APASS
DetailsDave Hannah
Heron Phone #: ###-#### basement ftgs