BLD-Final | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | PASS |
Phil Shearer
|
|
|
Call 1st Jeff seismic components and -engineering approval.......###-####. Tony youg has reseved all documentation needed.
|
DOC - Permit Finaled | 9/11/2015 | 9/11/2015 | 9/11/2015 | P | PASS |
Phil Shearer
|
|
|
|
FIRE-Final Inspection | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete per this building permit/scope of work.
|
BLD-Other | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PEND |
Tony Young
|
|
|
Call 1st Jeff seismic components and -engineering approval.......###-####,, call into J. Wylie, about flood plain cert,, not sure if its for this permit or not?,, all seismic up grades done,, still needs f/l/s ?
|
BLD-Other | 9/8/2015 | 9/9/2015 | 9/9/2015 | P | PEND |
Jim Sly
|
|
|
Jeff/// seismic inspection Phone #: ###-#### Re-sched.............
|
BLD-Other | 9/9/2015 | 9/10/2015 | 9/9/2015 | A | CANC |
Jim Sly
|
|
|
Call jeff 1st ......seismic Components and engineering approval. ###-####
|
BLD-Other | 8/26/2015 | 8/27/2015 | 8/28/2015 | P | PEND |
Dave Hannah
|
|
|
Jeff---epoxy bolt inspection Phone #: ###-#### needs spec inspection
|