Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberBLD14-03704
StatusFinaled
Name PETRA INC
Site Address 1125 W AMITY RD
Project NameNorco Warehouse Expansion
Customer Number 
ePlanReviewYes
Description
(NORCO) Warehouse Addition - To construct an 11,650 square foot, two story warehouse addition. 1st Floor: 8,750 sq. ft., 2nd Floor: 2,900 sq. ft.. This permit also includes the construction of a 1,315 square foot concrete dock, with metal roof cover that will connect two existing covered dock areas. The new dock cover and new warehouse addition will be separated by a two-hour fire wall separating the two buildings. There is an existing two-hour fire wall at the covered dock that will be relocated to line up with the new two-hour fire wall. This permit also includes related site improvements. The new warehouse will be constructed of a pre-engineered metal building (Behlen) with masonry exterior walls. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection9/22/20159/29/20159/29/2015PPASS
DetailsJim Page
Life fire safety passed/complete
BLD-Final9/20/20159/21/20159/21/2015PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Rex Frazier
FIRE-Alarm Testing9/15/20159/16/20159/15/2015ADONE
DetailsJim Page
Needed final signature on Fire Alarm section of permit card, signature complete on card.
BLD-Conference9/13/20159/14/20159/14/2015APART
DetailsJim Storey
Requesting life safety. Not seeing the option on drop down menu. Phone #: ###-#### Inspection requested via web by Rex Frazier need plm/fire sign offs/si close out/ weight posting racking.
BLD-Conference9/10/20159/10/20159/10/2015PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Rex Frazier
BLD-Conference7/23/20157/24/20157/24/2015APASS
DetailsJim Storey
Relocation of 2 hour fire wall on existing loading dock. Phone #: ###-#### Inspection requested via web by Rex Frazier
BLD-Footing4/23/20154/24/20154/24/2015APART
DetailsJim Storey
Late morning or around noon. Footing rebar inspection we are scheduled to pour concrete approximately 2:00 pm Friday afternoon Phone #: ###-#### Inspection requested via web by Rex Frazier rebar ok si ok for concrete and massonary.
BLD-Other3/27/20153/30/20153/30/2015ADEFR
DetailsJim Storey
We are requesting a SWPPP inspection for the above project. I left a voice mail on the Public Works department system as well. According to the Erosion and Sediment Control Program information, inspections are requested through the PDS system. Phone #: ###-#### Inspection requested via web by Greg Baisch esc long