FIRE-Final Inspection | 9/22/2015 | 9/29/2015 | 9/29/2015 | P | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
BLD-Final | 9/20/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Rex Frazier
|
FIRE-Alarm Testing | 9/15/2015 | 9/16/2015 | 9/15/2015 | A | DONE |
Jim Page
|
|
|
Needed final signature on Fire Alarm section of permit card, signature complete on card.
|
BLD-Conference | 9/13/2015 | 9/14/2015 | 9/14/2015 | A | PART |
Jim Storey
|
|
|
Requesting life safety. Not seeing the option on drop down menu. Phone #: ###-#### Inspection requested via web by Rex Frazier need plm/fire sign offs/si close out/ weight posting racking.
|
BLD-Conference | 9/10/2015 | 9/10/2015 | 9/10/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Rex Frazier
|
BLD-Conference | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Jim Storey
|
|
|
Relocation of 2 hour fire wall on existing loading dock. Phone #: ###-#### Inspection requested via web by Rex Frazier
|
BLD-Footing | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PART |
Jim Storey
|
|
|
Late morning or around noon. Footing rebar inspection we are scheduled to pour concrete approximately 2:00 pm Friday afternoon Phone #: ###-#### Inspection requested via web by Rex Frazier rebar ok si ok for concrete and massonary.
|
BLD-Other | 3/27/2015 | 3/30/2015 | 3/30/2015 | A | DEFR |
Jim Storey
|
|
|
We are requesting a SWPPP inspection for the above project. I left a voice mail on the Public Works department system as well. According to the Erosion and Sediment Control Program information, inspections are requested through the PDS system. Phone #: ###-#### Inspection requested via web by Greg Baisch esc long
|