Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD14-03711
StatusFinaled
Name TOEWS RICHARD
Site Address 723 N PIERCE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan Modification to add a dormer to the existing plans at the upper bedroom area** This permit is for an extensive remodel and 663s.f. addition to an existing 1197s.f. single family dwelling. The project will include the creation of a new 247s.f addition to the kitchen area including 93s.f. of new code complying stair to the upper level. the project will also include the remodel of the rear (west) portion of the upper level to allow for a new 323s.f. master suite. Separate electrical, plumbing, mechanical and ESC permits are required. R-1C setback proposed are approved by Sue Cummings. All per the approved plans as marked, Energy per prescriptive method, engineering calculations, ACCA report along with the plan review report. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/20/20177/24/20177/24/2017PPASS
DetailsDave Hannah
Rick Phone #: ###-####
DOC - Permit Finaled7/24/20177/24/20177/24/2017PPASS
DetailsDave Hannah
BLD-Conference5/1/20175/1/20175/2/2017PDONE
DetailsDave Hannah
Call hour before // Rich Phone #: ###-####
BLD-Conference1/26/20171/26/20171/26/2017PDONE
DetailsJim Sly
Call hour before // Rick Phone #: ###-####
Told Rick to call Bill Vandergrift for advice on hood loaction.
BLD-Conference6/2/20166/3/20166/3/2016PPASS
DetailsDave Hannah
Rick Phone #: ###-####please call 45 minutes prior for access
BLD-Conference5/18/20165/19/20165/19/2016PDONE
DetailsPhil Shearer
Rick Phone #: ###-####. Stained glass window in shower.
BLD-Energy code compliance10/30/201510/30/201510/30/2015PPASS
DetailsDave Hannah
would like call ahead; Rick Phone #: ###-####
BLD-Framing/Rough-in10/20/201510/20/201510/20/2015PPASS
DetailsDave Hannah
Rick Phone #: ###-####-please call 1 prior to meet
BLD-Conference10/5/201510/5/201510/5/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference9/29/20159/30/20159/30/2015ADONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference8/20/20158/20/20158/20/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference8/11/20158/11/20158/11/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference8/6/20158/6/20158/6/2015PDONE
DetailsDave Hannah
Rich Phone #: ###-####
BLD-Conference7/29/20157/29/20157/29/2015PPASS
DetailsJim Storey
Rick Phone #: ###-####
BLD-Conference7/15/20157/15/20157/16/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference6/16/20156/16/20156/17/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference6/15/20156/15/20156/15/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference6/2/20156/3/20156/3/2015ADONE
DetailsDave Hannah
Rich Phone #: ###-#### needs to resubmit plans for change to second floor
BLD-Conference5/28/20155/28/20155/28/2015PCANC
DetailsTony Young
Rick// please call before Phone #: ###-####
BLD-Conference5/26/20155/26/20155/26/2015PDONE
DetailsJim Storey
Rick Phone #: ###-#### going to add dormer to front of house.fyi
BLD-Conference4/16/20154/16/20154/17/2015PDONE
DetailsDave Hannah
Rich Phone #: ###-####
BLD-Conference3/30/20153/30/20153/30/2015PDONE
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Foundation3/23/20153/23/20153/23/2015PPASS
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Footing3/19/20153/19/20153/19/2015PPASS
DetailsDave Hannah
Rick Phone #: ###-####
BLD-Conference3/4/20153/5/20153/5/2015APASS
DetailsDave Hannah
Please call ahead for access -Richard Phone #: ###-####