BLD-Final | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | PASS |
Dave Hannah
|
|
|
As late as possible // Brandon Phone #: ###-####
|
DOC - Permit Finaled | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Concrete | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | PASS |
Dave Hannah
|
|
|
Front stairs - Brandon Phone #: ###-####
|
BLD-Other | 8/14/2015 | 8/17/2015 | 8/17/2015 | A | PASS |
Dave Hannah
|
|
|
Fire rated soffits - Brandon Phone #: ###-####
|
BLD-Energy code compliance | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | PASS |
Dave Hannah
|
|
|
Brandon Phone #: ###-####
|
BLD-Framing/Rough-in | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | PASS |
Dave Hannah
|
|
|
Brandon Phone #: ###-####
|
BLD-Framing/Rough-in | 7/28/2015 | 7/29/2015 | 7/29/2015 | A | FAIL |
Mike Jordan
|
|
|
Josh phone ###-####. Noted no engineering to coorect any of the wall bracing issues from previous inspection and correction notice. Portal frame nailing not complete. Provide h2.5 on interior bearing on T40, T41 and T42 trusses. Provide an approved fix from truss engineer for T46 truss. Provide (2) 2x at interior bearing for 2ply T02. Complete lateral bracing on on 2ply T47 and instsall the required bearing blocks. South bearing on trussesT17 thru T21 and J02 thru J05 aRE BEARING AT THE INCOORECT LOCATION. Provide approved fix or that the beaRING location ids ok from truss engineer. Provide blocking at interior bearing for t36 thru t39 trusses and h2.5. Fireblock the concealed space in garage above electrical panel at ceiling level. A correction notice has been posted. No insulation or exterior cover at this time.
|
BLD-Framing/Rough-in | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | NR |
Jim Sly
|
|
|
Josh Phone #: ###-#### Correction notice posted.....Tried to do Shear and framing........was only able to complete shear (some what) because it was so incomplete. Ran out of time.
|
BLD-Wall Bracing | 7/20/2015 | 7/20/2015 | 7/21/2015 | P | FAIL |
Dave Hannah
|
|
|
Shear // Josh Phone #: ###-#### needs to restapel
|
BLD-Wall Bracing | 7/9/2015 | 7/9/2015 | 7/9/2015 | P | FAIL |
Dave Hannah
|
|
|
Josh Phone #: ###-#### c/n on site
|
BLD-Footing | 4/28/2015 | 4/28/2015 | 4/29/2015 | P | PASS |
Dave Hannah
|
|
|
JR Phone #: ###-####
|
BLD-Foundation | 4/29/2015 | 4/29/2015 | 4/29/2015 | A | PASS |
Dave Hannah
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 4/23/2015 | 4/23/2015 | 4/23/2015 | P | PASS |
Dave Hannah
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 4/20/2015 | 4/21/2015 | 4/23/2015 | A | NR |
Dave Hannah
|
|
|
JR Phone #: ###-#### needs geo sign off no inspection done
|
BLD-Footing | 3/31/2015 | 3/31/2015 | 4/1/2015 | P | PASS |
Dave Hannah
|
|
|
JR// pour time is 4pm// please call before Phone #: ###-####
|
BLD-Foundation | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PART |
Dave Hannah
|
|
|
basement walls ok to pour
|
BLD-Footing | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | CANC |
Dave Hannah
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 3/16/2015 | 3/17/2015 | 3/17/2015 | A | PART |
Dave Hannah
|
|
|
JR Phone #: ###-#### basement section ok to place
|