BLD-Final | 6/5/2015 | 6/8/2015 | 6/8/2015 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 6/4/2015 | 6/5/2015 | 6/5/2015 | P | PASS |
Jim Page
|
|
|
Life safety passed/complete
|
FIRE-Final Inspection | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | CANC |
Troy Cobbley
|
|
|
cancel per Mike Phone #: ###-####
|
FIRE-Final Inspection | 5/12/2015 | 5/13/2015 | 5/13/2015 | A | FAIL |
Troy Cobbley
|
|
|
I met Mike at the project site and discussed the fire alarm requirements.
|
FIRE-Final Inspection | 5/11/2015 | 5/12/2015 | 5/12/2015 | A | CANC |
Troy Cobbley
|
|
|
Need a fire alarm permit prior to the life safety inspection for the new Consulting Room at the Pharmacy and the two disable duct smoke detectors on the Mezzanine.
|
BLD-Final | 5/11/2015 | 5/12/2015 | 5/12/2015 | P | NR |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | NR |
Mike Jordan
|
|
|
MIKE Phone #: ###-####. Needs fire/life/safety finals.
|
BLD-Final | 4/6/2015 | 4/7/2015 | 4/7/2015 | P | NR |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Fire/life/safety failed.
|
FIRE-Final Inspection | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | FAIL |
Troy Cobbley
|
|
|
life safety ok to final when Pharmacy Consult Room is provided with fire alarm notification coverage.
|
BLD-Framing/Rough-in | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. INteior steel stud framing for phase 3 soffits.
|
FIRE-Final Inspection | 2/18/2015 | 2/18/2015 | 2/19/2015 | P | PART |
Troy Cobbley
|
|
|
Life safety in new Deli area passed. Area ok to occupy
|
BLD-Framing/Rough-in | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. ceiling grid phase 1 ok.
|
BLD-Framing/Rough-in | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. phase 2 soffit ok. Noted that contractorhas stated that engineer has reviewed the in place work for phase 1 and has accepted the in place work. Still awaiting for letter.
|
BLD-Framing/Rough-in | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PART |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Interior steel stud framing for half wall and new restroom. Aslo inspected framing for new soffit. Soffit no built per approved plans, provide additional deatails and engineering calcs showing that bottom chords of existing trusses will supprt the additional load.
|