BLD-Final | 5/21/2015 | 5/22/2015 | 5/22/2015 | P | PASS |
Jim Sly
|
|
|
Curtis Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Conference | 5/20/2015 | 5/20/2015 | 5/21/2015 | P | PASS |
Dave Hannah
|
|
|
Curtis Phone #: ###-#### ok to remove exit signs and door hardwear on doors in storefront in sorage area
|
BLD-Ceiling Grid Inspection | 5/19/2015 | 5/19/2015 | 5/20/2015 | P | PASS |
Dave Hannah
|
|
|
Curtis Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/15/2015 | 5/18/2015 | 5/18/2015 | A | CANC |
Dave Hannah
|
|
|
Per Curtis Phone #: ###-####
|
BLD-Framing/Rough-in | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | PASS |
Dave Hannah
|
|
|
Curtis Phone #: ###-####
|
BLD-Energy code compliance | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Mike Jordan
|
|
|
Curtis Phone #: ###-####
|
BLD-Framing/Rough-in | 4/15/2015 | 4/15/2015 | 4/16/2015 | P | PART |
Dave Hannah
|
|
|
Curtis-partial rough in-2nd insulation--as early PM as possilbe Phone #: ###-#### ok to cover ext walls in t/i and eastwall
|
BLD-Framing/Rough-in | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | PASS |
Mike Jordan
|
|
|
exterior perimeter walls ok to insulate. demissing wall seperating warehouse from offices ok. no harlids or ofiice walls or restroom walls ready at this time.
|
BLD-Framing/Rough-in | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | NR |
Mike Jordan
|
|
|
Curtis Phone #: ###-####. Moved to pm.
|
BLD-Framing/Rough-in | 4/10/2015 | 4/13/2015 | 4/13/2015 | A | PART |
Mike Jordan
|
|
|
curtis Phone #: ###-####. fire riser room only.
|