BLD-Final | 3/14/2016 | 3/15/2016 | 3/14/2016 | A | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 3/14/2016 | 3/14/2016 | 3/14/2016 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 3/11/2016 | 3/14/2016 | 3/14/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | NR |
Jim Sly
|
|
|
Eric Phone #: ###-#### Need Public works and Fire finals
|
FIRE-Final Inspection | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide building address on the street side of the building, remove arrow on exit sign directing people to locked door, provide fire dept access signage per notes.
|
BLD-Framing/Rough-in | 12/14/2015 | 12/15/2015 | 12/15/2015 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/1/2015 | 12/1/2015 | 12/1/2015 | P | PART |
Jim Sly
|
|
|
Eric Phone #: ###-#### 1st layer of rock on ceiling.....OK OK for 2nd layer.
|
BLD-Framing/Rough-in | 11/30/2015 | 11/30/2015 | 11/30/2015 | P | PART |
Jim Sly
|
|
|
Eric Phone #: ###-#### Ext shear nailing OK.......Trusses OK......OK to install 1st layer of rock on ceiling .......... pending Electr, Plumb and Mech. approval for cover.
|
BLD-Foundation | 9/30/2015 | 10/1/2015 | 10/1/2015 | P | PASS |
Jim Sly
|
|
|
Wes Phone #: ###-####
|
BLD-Footing | 9/29/2015 | 9/30/2015 | 9/30/2015 | A | PASS |
Jim Sly
|
|
|
Wes Phone #: ###-####
|
BLD-Footing | 9/25/2015 | 9/28/2015 | 9/28/2015 | P | NR |
Jim Sly
|
|
|
Jerry Phone #: ###-####
|
BLD-Footing | 9/24/2015 | 9/25/2015 | 9/25/2015 | P | CANC |
Jim Sly
|
|
|
Dane Phone #: ###-####
|