Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-00377
StatusFinaled
Name JRW CONSTRUCTION
Site Address 5598 N EAGLE RD
Project NameStrategic SOS
Customer Number15-00378
ePlanReviewNo
Description
(STRATEGIC SOS - Shell & Core) - To construct a new 6,700 square foot, one story wood framed office shell building and related site improvements. **PLAN MODIFICATION - 11/5/15 Modification to drainage system only. **TLW** This shell building is being designed for two future office tenant spaces. Separate tenant improvement permits will be required to finish this building for occupancy. The east side of this building will be finished as an office tenant under building permit BLD15-00378. This building is not fire sprinklered. All construction per the approved plans and attached comment list.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/14/20163/15/20163/14/2016APASS
DetailsJim Sly
Eric Phone #: ###-####
DOC - Permit Finaled3/14/20163/14/20163/14/2016PPASS
DetailsJim Sly
FIRE-Final Inspection3/11/20163/14/20163/14/2016APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final3/10/20163/11/20163/11/2016ANR
DetailsJim Sly
Eric Phone #: ###-####
Need Public works and Fire finals
FIRE-Final Inspection3/10/20163/10/20163/10/2016PFAIL
DetailsTroy Cobbley
Provide building address on the street side of the building, remove arrow on exit sign directing people to locked door, provide fire dept access signage per notes.
BLD-Framing/Rough-in12/14/201512/15/201512/15/2015PPASS
DetailsJim Sly
Eric Phone #: ###-####
BLD-Ceiling Grid Inspection12/1/201512/1/201512/1/2015PPART
DetailsJim Sly
Eric Phone #: ###-####
1st layer of rock on ceiling.....OK OK for 2nd layer.
BLD-Framing/Rough-in11/30/201511/30/201511/30/2015PPART
DetailsJim Sly
Eric Phone #: ###-####
Ext shear nailing OK.......Trusses OK......OK to install 1st layer of rock on ceiling .......... pending Electr, Plumb and Mech. approval for cover.
BLD-Foundation9/30/201510/1/201510/1/2015PPASS
DetailsJim Sly
Wes Phone #: ###-####
BLD-Footing9/29/20159/30/20159/30/2015APASS
DetailsJim Sly
Wes Phone #: ###-####
BLD-Footing9/25/20159/28/20159/28/2015PNR
DetailsJim Sly
Jerry Phone #: ###-####
BLD-Footing9/24/20159/25/20159/25/2015PCANC
DetailsJim Sly
Dane Phone #: ###-####