Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-00454
StatusFinaled
Name WESTMINSTER II
Site Address 270 W CIRCLE WAY DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI zone A, class A roof, Permit for the construction of a new 1401 sq. ft., two story (first story 641 sq. ft., second story 760 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 371 sq. ft. of covered patio/porch and a 472 sq. ft. attached garage. R-1B zoning and setbacks ok per Dave Moser. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946. All per the approved plans as marked Energy Prescriptive method ACCA report, engineering and engineer's calculations amd the plan review report.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/30/201512/30/201512/30/2015PPASS
DetailsTony Young
Josh Phone #: ###-####
DOC - Permit Finaled12/30/201512/30/201512/30/2015PPASS
DetailsTony Young
c of o issued
BLD-Final12/18/201512/18/201512/18/2015PPEND
DetailsTony Young
would like call ahead; Josh Phone #: ###-####,, all ok,,, just needs hillside sign off
BLD-Final12/11/201512/14/201512/14/2015ANR
DetailsTony Young
JOSH - CALL 30 MINS PRIOR FOR ACCESS Phone #: ###-####
BLD-Final12/11/201512/11/201512/11/2015PNR
DetailsTony Young
JOSH - CALL 30 MINS PRIOR FOR ACCESS Phone #: ###-####,, c/n posted
BLD-Final12/4/201512/4/201512/4/2015PNR
DetailsJim Storey
would like call ahead; Josh Phone #: ###-#### need mech and public works
BLD-Conference8/24/20158/25/20158/25/2015AFAIL
DetailsTony Young
porch follow up,, still waiting on justification missed bearing on porch footings,, fixes
BLD-Conference8/7/20158/10/20158/10/2015APEND
DetailsTony Young
porch follow up,,, will call in for conference
BLD-Conference8/6/20158/7/20158/7/2015PNH
DetailsTony Young
porch follow up,,
BLD-Conference8/6/20158/6/20158/6/2015PFAIL
DetailsTony Young
porch follow up,, post bases missed,, need engineering for as built or justify, no inspections were called in , DO NOT COVER
BLD-Other6/3/20156/3/20156/3/2015PPASS
DetailsPhil Shearer
Josh Phone #: ###-####. Sofit
BLD-Framing/Rough-in6/2/20156/2/20156/3/2015PPASS
DetailsPhil Shearer
Josh Phone #: ###-####
BLD-Energy code compliance6/2/20156/2/20156/3/2015PPASS
DetailsPhil Shearer
Josh Phone #: ###-####
BLD-Framing/Rough-in5/28/20155/28/20155/28/2015PPART
DetailsTony Young
Josh Phone #: ###-####,, c/n posted on plans,, see Josh,, seal draft stop, redo porch supports,, need soffit inspection,, ok to insulate
BLD-Wall Bracing5/19/20155/19/20155/19/2015PPASS
DetailsTony Young
Josh Phone #: ###-####
BLD-Wall Bracing5/18/20155/19/20155/19/2015ANR
DetailsTony Young
Josh Phone #: ###-####
BLD-Wall Bracing5/18/20155/18/20155/18/2015PFAIL
DetailsTony Young
Josh Phone #: ###-####,, need to redo shear/brace panels per plan
BLD-Foundation4/15/20154/15/20154/15/2015PPART
DetailsTony Young
JR Phone #: ###-####,, work in progress
BLD-Foundation4/14/20154/15/20154/15/2015ANR
DetailsTony Young
JR Phone #: ###-####,, late am
BLD-Footing4/14/20154/14/20154/14/2015PPASS
DetailsTony Young
JR Phone #: ###-####
BLD-Footing4/13/20154/14/20154/14/2015APART
DetailsTony Young
JR Phone #: ###-####,, work in progress
BLD-Footing4/13/20154/13/20154/13/2015PFAIL
DetailsTony Young
JR Phone #: ###-####,, need hillside report,, need reviewed plans to show rebar