BLD-Final | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | PASS |
Jim Sly
|
|
|
Mark Phone #: ###-####
|
DOC - Permit Finaled | 4/10/2015 | 4/10/2015 | 4/10/2015 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 4/8/2015 | 4/9/2015 | 4/9/2015 | P | NR |
Dave Hannah
|
|
|
Mark Phone #: ###-#### faled fire
|
FIRE-Final Inspection | 4/3/2015 | 4/6/2015 | 4/6/2015 | A | PART |
Troy Cobbley
|
|
|
Life safety passed on fourth floor only. Life safety will be ok to pass for basement scope of work wient permit is issued/passed for access control egress doors interconnection permit with the existing fire alarm system. This new work will require a permit.
|
BLD-Ceiling Grid Inspection | 3/27/2015 | 3/30/2015 | 3/30/2015 | A | PASS |
Dave Hannah
|
|
|
Mark Phone #: ###-####
|
FIRE-Conference | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | DONE |
Forrest France
|
|
|
On site conference and discussion with contractor regarding fire life safety inspection items, project related fire sprinkler and alarm work, egress door hardware, etc.
|
FIRE-Conference | 3/16/2015 | 3/17/2015 | 3/17/2015 | A | DONE |
Forrest France
|
|
|
Regarding project schedule.
|
BLD-Framing/Rough-in | 3/10/2015 | 3/10/2015 | 3/10/2015 | P | PART |
Tony Young
|
|
|
call half hour before // Mark Phone #: ###-####,, walls ok
|
BLD-Framing/Rough-in | 3/6/2015 | 3/10/2015 | 3/10/2015 | A | DEFR |
Tony Young
|
|
|
call half hour before // Mark Phone #: ###-####,, needs ele 1st
|