BLD-Final | 9/14/2016 | 9/14/2016 | 9/14/2016 | P | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
BLD-Final | 9/6/2016 | 9/7/2016 | 9/12/2016 | P | NR |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Final | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | DEFR |
Jim Storey
|
|
|
Randy Phone #: ###-#### to wed pm
|
FIRE-Final Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/10/2016 | 8/11/2016 | 8/11/2016 | A | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-#### temp ok pending others
|
BLD-Final | 8/9/2016 | 8/10/2016 | 8/10/2016 | A | NR |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
BLD-Final | 8/5/2016 | 8/8/2016 | 8/9/2016 | P | NR |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
FIRE-Final Inspection | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | PART |
Troy Cobbley
|
|
|
Pending approval of other trade inspection groups; a temporary occupancy is ok for life safety with Scott's permission. I need the project related fire alarm and fire sprinkler permits addressed, a permanant address, riser room signage, the swimming pool permit finaled, occupant load sign and door hardware for pool area installed.
|
FIRE-Final Inspection | 8/5/2016 | 8/8/2016 | 8/8/2016 | A | FAIL |
Troy Cobbley
|
|
|
Need to finish life safety. Today I verified smoke alarms, fire dept access, fire hydrants, need for new address numbers, ships ladder to roof. I let the contractor know that the separate permit for the swimming pool needs to be finaled prior to the main building being signed off. To finish out I need to have the project related fire alarm and fire sprinkler permits finaled, fire extinguishers verifed, exit signs and emergency light verified, door hardware, roof access signage, riser room signage, fire dept access signage.
|
BLD-Ceiling Grid Inspection | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PASS |
Jim Storey
|
|
|
Randy// 1st floor Phone #: ###-####
|
BLD-Other | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PASS |
Jim Storey
|
|
|
Randy// cover inspection for a soffit Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PART |
Mike Jordan
|
|
|
Bob Phone #: ###-####// 1st floor vestible. Needs to hand patch pan decking were roof drain is.
|
BLD-Ceiling Grid Inspection | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Mike Jordan
|
|
|
Bob// 2nd floor Phone #: ###-####. 2nd floor corridor ok.
|
BLD-Ceiling Grid Inspection | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Jim Storey
|
|
|
3rd and 4th floor // Bob Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | FAIL |
Jim Storey
|
|
|
Bob Phone #: ###-#### need clips/fire chalk
|
BLD-Other | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Jim Storey
|
|
|
hard lid; Bob Phone #: ###-#### drops 1st floor
|
BLD-Other | 6/9/2016 | 6/10/2016 | 6/10/2016 | A | PASS |
Jim Storey
|
|
|
upper hardlid, 2nd Floor: Bob Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Other | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Jim Storey
|
|
|
Randy// drop lid inspection for 2nd floor Phone #: ###-####
|
BLD-Final | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | CANC |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Other | 5/26/2016 | 5/27/2016 | 5/27/2016 | P | PASS |
Phil Shearer
|
|
|
hard lid rock ceiling; Keegan Phone #: 8091366. 3rd, 4th floor OK
|
BLD-Conference | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | PART |
Jim Storey
|
|
|
would like call ahead; Randy Phone #: ###-#### box spk pipe
|
BLD-Ceiling Grid Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 | P | FAIL |
Jim Storey
|
|
|
3rd, 4th floor; Keagan Phone #: ###-####
|
BLD-Framing/Rough-in | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Jim Storey
|
|
|
Randy// inspection for 1st floor Phone #: ###-####
|
BLD-Framing/Rough-in | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | PASS |
Jim Storey
|
|
|
1st floor; Randy Phone #: ###-####
|
BLD-Framing/Rough-in | 5/10/2016 | 5/10/2016 | 5/10/2016 | P | PASS |
Jim Storey
|
|
|
RC resilance channel 1st floorceilling only
|
BLD-Energy code compliance | 4/28/2016 | 4/28/2016 | 4/28/2016 | P | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Framing/Rough-in | 4/26/2016 | 4/27/2016 | 4/27/2016 | A | PART |
Jim Storey
|
|
|
Bob Phone #: ###-#### all but 2hr east shaft and stair
|
BLD-Other | 4/18/2016 | 4/19/2016 | 4/19/2016 | A | PASS |
Jim Storey
|
|
|
Randy-R C Channel Phone #: ###-####
|
BLD-Other | 4/13/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Jim Storey
|
|
|
4th floor pony walls, 3rd floor vapor barrier/insulation; Bob Phone #: ###-#### 3 and 4 ok to cover
|
BLD-Framing/Rough-in | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PART |
Jim Storey
|
|
|
Fire caulking on 4th & 3rd - Randy Phone #: ###-#### wip/ plm ceilling 3rd ok
|
BLD-Other | 4/8/2016 | 4/11/2016 | 4/11/2016 | A | DEFR |
Jim Storey
|
|
|
Fire caulking on 4th & 3rd - Randy Phone #: ###-####
|
BLD-Other | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Jim Storey
|
|
|
Walt-fire stop mechanical shafts Phone #: ###-#### 4th floor
|
BLD-Wall cover | 4/1/2016 | 4/4/2016 | 4/4/2016 | A | PART |
Jim Storey
|
|
|
Inside // Bob Phone #: ###-#### 4th floor ok pending sharts w hvac
|
BLD-Energy code compliance | 4/1/2016 | 4/4/2016 | 4/4/2016 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-#### 4th floor r25 ok
|
BLD-Framing/Rough-in | 3/29/2016 | 3/29/2016 | 3/29/2016 | P | PART |
Jim Storey
|
|
|
4th floor // Bob Phone #: ###-#### exterior walls ok to insulate
|
BLD-Framing/Rough-in | 3/8/2016 | 3/8/2016 | 3/8/2016 | P | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-#### corridors ok to cover1 thur 4
|
BLD-Framing/Rough-in | 3/1/2016 | 3/2/2016 | 3/2/2016 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-#### first floor ceilling ok to cover
|
BLD-Wall Bracing | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | PASS |
Jim Storey
|
|
|
Randy-strap and nail Phone #: ###-#### hardware and nailling ok on roof deck.
|
BLD-Wall Bracing | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | DEFR |
Jim Storey
|
|
|
Randy-strap and nail Phone #: ###-#### out of time rolled to am
|
BLD-Wall Bracing | 2/1/2016 | 2/1/2016 | 2/1/2016 | P | PASS |
Jim Storey
|
|
|
Shear // Randy Phone #: ###-#### west/south/north up to off set roof drain up to 4 th floor exteior ok
|
BLD-Other | 12/8/2015 | 12/9/2015 | 12/9/2015 | P | PASS |
Jim Storey
|
|
|
Diamond steel colimn grouting - Randy Phone #: ###-#### interiors ok
|
BLD-Other | 10/29/2015 | 10/30/2015 | 10/30/2015 | A | PASS |
Jim Storey
|
|
|
Slab pour // Randy Phone #: ###-####
|
BLD-Foundation | 10/27/2015 | 10/28/2015 | 10/28/2015 | A | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Foundation | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | PEND |
Dave Hannah
|
|
|
Randy Phone #: ###-#### ok after spec inspection sign off
|
BLD-Footing | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####pwsi
|
BLD-Foundation | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | PART |
Jim Storey
|
|
|
Randy Phone #: ###-#### placed w si
|
BLD-Footing | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | PART |
Jim Storey
|
|
|
Bob Phone #: ###-####wip /psi
|
BLD-Foundation | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | PART |
Jim Storey
|
|
|
would like early as possible; Randy Phone #: ###-#### placed w/si pending report
|
BLD-Foundation | 9/14/2015 | 9/17/2015 | 9/17/2015 | P | PART |
Jim Storey
|
|
|
Pouring at 12:30 - Randy Phone #: ###-#### placed w/si pending report
|
BLD-Footing | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Footing | 8/27/2015 | 8/31/2015 | 8/31/2015 | P | PASS |
Jim Storey
|
|
|
Change day per Randy Phone #: ###-#### si pending /rebar ok from10-25 a -d // 25 - 20
|