Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD15-00615
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 721 E ORION DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI zone A, class A roof, Permit for the construction of a new 3,863 sq. ft., three story (upper level 2,249 sq. ft., lower level 573 sq. ft., basement 1,041) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 476 sq. ft. of covered patio/porch and a 980 sq. ft. attached garage per the approved plans, plan review report and any notations. A-1 zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/8/20167/8/20167/8/2016 DONE
DetailsTony Young
no inspection,, done
DOC - Permit Finaled7/8/20167/8/20167/8/2016PPASS
DetailsTony Young
done
BLD-Grading Inspection3/17/20163/17/20163/18/2016PCANC
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Foundation2/25/20162/25/20162/25/2016PPART
DetailsTony Young
Chris Phone #: ###-####,, work in progress on retaining wall
BLD-Final1/19/20161/20/20161/20/2016APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO
DOC - Permit Finaled1/20/20161/20/20161/20/2016PPASS
DetailsTony Young
c of o issued
BLD-Final1/15/20161/19/20161/19/2016APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, need handrails per code,, need address per code,,
BLD-Footing12/17/201512/17/201512/17/2015PCANC
DetailsTony Young
Pat Phone #: ###-####
BLD-Footing12/16/201512/17/201512/17/2015AFAIL
DetailsTony Young
Pat Phone #: ###-####,, need engineering and plan approved for new retaing wall prior to final,, also still need soils report for same
BLD-Footing12/16/201512/16/201512/16/2015PPEND
DetailsTony Young
Pat Phone #: ###-####,,, need soils report approved by public works
BLD-Footing12/15/201512/15/201512/15/2015PCANC
DetailsTony Young
Pat Phone #: ###-####,, not ready for the retaining wall footing
BLD-Other10/15/201510/15/201510/16/2015PPASS
DetailsTony Young
Wiring inspection in soffit boxes for can lights. Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Other10/14/201510/15/201510/15/2015APASS
DetailsTony Young
Wiring inspection in soffit boxes for can lights. Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Other10/13/201510/14/201510/15/2015PNR
DetailsTony Young
Wiring inspection in soffit boxes for can lights. Phone #: ###-#### Inspection requested via web by SHANE JAYO,, electrical ok
BLD-Energy code compliance10/8/201510/9/201510/9/2015AFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, need interior stairs,, need soffit issue resolved,, ok to sheet rock if needed,, BUT.. now is a good time to resolve soffit issue due to being able to see some from inside
BLD-Framing/Rough-in10/6/201510/6/201510/6/2015PPART
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by SHANE JAYO. Stairs not complete.
BLD-Other8/26/20158/26/20158/26/2015PFAIL
DetailsTony Young
Shane- ###-####/// this inspection is for the soffit
BLD-Other8/25/20158/26/20158/26/2015AFAIL
DetailsTony Young
Shane- ###-####/// this inspection is for the soffit,, needs electrical pass for soffits
BLD-Other8/24/20158/25/20158/25/2015ANR
DetailsTony Young
Shane- ###-####/// this inspection is for the soffit,, needs electrical 1st
BLD-Other8/21/20158/24/20158/24/2015ANR
DetailsTony Young
Shane- ###-####/// this inspection is for the soffit
need electrical rough in 1st
BLD-Other8/20/20158/21/20158/21/2015ANR
DetailsTony Young
Shane- ###-####/// this inspection is for the soffit
need electrical 1st,, ok to cover other areas without electrical
BLD-Other8/20/20158/20/20158/20/2015PPART
DetailsTony Young
Shane- ###-####/// this inspection is for the can light ,, boxes for lights ok,, still need electrical inspection prior to cover,, ok to start soffit areas without electrical
BLD-Footing5/20/20155/20/20155/20/2015PNR
DetailsTony Young
Pat Phone #: ###-####
BLD-Wall Bracing5/19/20155/20/20155/20/2015ANR
DetailsTony Young
Pat Phone #: ###-####
BLD-Footing5/14/20155/15/20155/15/2015AFAIL
DetailsTony Young
Pat// ###-####,, need soils report
BLD-Foundation5/14/20155/14/20155/14/2015PNR
DetailsTony Young
Pat// ###-####
BLD-Footing5/6/20155/7/20155/7/2015AFAIL
DetailsTony Young
Chris// pour time 12pm Phone #: ###-####,, need soils approval 1st
BLD-Footing5/6/20155/6/20155/6/2015PPEND
DetailsTony Young
Chris// pour time 12pm Phone #: ###-####
BLD-Footing5/5/20155/6/20155/6/2015AFAIL
DetailsTony Young
Chris// pour time 12pm Phone #: ###-####,, need soils 1st,, then ok to pour
BLD-Footing5/5/20155/5/20155/5/2015PNR
DetailsTony Young
Chris// pour time 12pm Phone #: ###-####,, need soils report 1st,, then ok