BLD-Final | 4/14/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Tony Young
|
|
|
Keegan Phone #: ###-####,, ok for c of o
|
FIRE-Final Inspection | 4/14/2016 | 4/15/2016 | 4/15/2016 | A | PASS |
Jim Page
|
|
|
Overhead fire sprinkler inspection complete (FIR15-00687), fire sprinkler underground inspection complete (FIR15-00547), fire alarm inspection complete (FIR15-00911) fire alarm communicator inspection complete (FIR16-00262). Fire extinguishers in place with current inspection tags, egress illumination verified (interior and discharge landing). Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 4/14/2016 | 4/15/2016 | 4/15/2016 | P | CANC |
Katie Marron
|
|
|
Keegan Phone #: ###-####
|
BLD-Conference | 3/29/2016 | 3/30/2016 | 3/30/2016 | P | DONE |
Mike Jordan
|
|
|
Keegan Phone #: ###-####
|
BLD-Other | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | PART |
Jim Sly
|
|
|
Keegan// fire calking inspection for the first floor corridor Phone #: ###-#### All firestopping above hard ceiling in main floor corridor......OK
|
BLD-Other | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | NR |
Tony Young
|
|
|
Fire caulking - Keegan Phone #: ###-####,, need to add some in areas in main floor corridor
|
BLD-Conference | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PEND |
Tony Young
|
|
|
Solar Panel; Keagan Phone #: ###-####,,
|
BLD-Conference | 1/27/2016 | 1/28/2016 | 1/28/2016 | A | PEND |
Tony Young
|
|
|
Solar Panel; Keagan Phone #: ###-####,, need to verify
|
BLD-Other | 1/26/2016 | 1/27/2016 | 1/27/2016 | A | PEND |
Tony Young
|
|
|
Solar Panel; Keagan Phone #: ###-####,, will need fire and electrical approval 1st,, need to verify this was part of scope of the work,, need to verify trusses were designed for added load
|
BLD-Other | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | PART |
Tony Young
|
|
|
Fire caulking east 7 lower units - Keegan Phone #: ###-####,, east 7 units ok,,
|
BLD-Other | 1/19/2016 | 1/20/2016 | 1/20/2016 | A | PART |
Tony Young
|
|
|
Fire caulking - Keegan Phone #: ###-####,, work in progress,, 7 lower east side,, ok
|
BLD-Framing/Rough-in | 1/15/2016 | 1/15/2016 | 1/17/2016 | P | PART |
Tony Young
|
|
|
Keagan Phone #: ###-####,, upper east 7 units ok
|
BLD-Framing/Rough-in | 12/29/2015 | 12/31/2015 | 12/31/2015 | A | PART |
Tony Young
|
|
|
Keagan Phone #: ###-####,, 2nd phase ok to prerock
|
BLD-Framing/Rough-in | 12/17/2015 | 12/18/2015 | 12/18/2015 | A | PART |
Tony Young
|
|
|
Kegan Phone #: ###-####,, work in progress,, ok to insulate
|
BLD-Conference | 12/17/2015 | 12/17/2015 | 12/17/2015 | P | DEFR |
Tony Young
|
|
|
Kegan Phone #: ###-####
|
BLD-Framing/Rough-in | 12/11/2015 | 12/14/2015 | 12/14/2015 | A | PART |
Tony Young
|
|
|
Keagan Phone #: ###-####,, ok to continue,, phase one,, west 8 units,, with insulation,, need to see prior to cover,, needs sprinkler inspection to see tenting also
|
BLD-Framing/Rough-in | 12/10/2015 | 12/11/2015 | 12/11/2015 | A | PART |
Tony Young
|
|
|
Keagan Phone #: ###-####,, need sprinkler rough in pass,, mech is ok for now, the rest will be below drop ceiling,, prior corrections done,, also ok to procede with washer boxes
|
BLD-Framing/Rough-in | 12/7/2015 | 12/8/2015 | 12/8/2015 | A | PART |
Tony Young
|
|
|
First Floor framing - Keagan Phone #: ###-####,, walk through only with plan reviewer, mechanical inspection reviewer.. need to finish and recall
|
BLD-Conference | 12/3/2015 | 12/4/2015 | 12/4/2015 | P | PART |
Tony Young
|
|
|
Keagan Phone #: ###-####,, frame ?s
|
BLD-Framing/Rough-in | 11/24/2015 | 11/25/2015 | 11/25/2015 | A | CANC |
Tony Young
|
|
|
Keigan Phone #: ###-####
|
BLD-Wall cover | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | PART |
Jim Sly
|
|
|
Shear // Keegan Phone #: ###-#### South side of Bldg.......OK.
|
BLD-Framing/Rough-in | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | PART |
Jim Sly
|
|
|
Keegan Phone #: ###-#### Phase 1 corridor 1st floor and Electrical room 1st floor OK to cover.
|
BLD-Foundation | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | CANC |
Jim Sly
|
|
|
Shear // Keegan Phone #: ###-####
|
BLD-Wall Bracing | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | PART |
Jim Sly
|
|
|
OK to install Wainscot rock at North wall .......Exterior nailing ok at that area only.
|
BLD-Framing/Rough-in | 10/23/2015 | 10/26/2015 | 10/26/2015 | P | PART |
Tony Young
|
|
|
Northwest portion - Keegan Phone #: ###-####,, n/west roof ok,, also west wall bracing on upper and lower ok
|
BLD-Wall Bracing | 10/9/2015 | 10/13/2015 | 10/13/2015 | A | PART |
Tony Young
|
|
|
Shear // Keegan Phone #: ###-####,, see plan for notes on where shear has been approved
|
BLD-Other | 9/30/2015 | 9/30/2015 | 10/1/2015 | P | PART |
Tony Young
|
|
|
Concrete // Keegin Phone #: ###-####,, flat work
|
BLD-Other | 9/21/2015 | 9/22/2015 | 9/22/2015 | P | DEFR |
Mike Jordan
|
|
|
later the better please for slab rebar & mesh - Keegan Phone #: ###-####. Pend. special inspection.
|
BLD-Ceiling Grid Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | CANC |
Mike Jordan
|
|
|
Kevin// the later the better Phone #: ###-####
|
BLD-Other | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | PART |
Mike Jordan
|
|
|
Kevin// the later the better Phone #: ###-####. Work in progress for welded wire mesh at slab on grade, pend. special inspection.
|
BLD-Other | 9/4/2015 | 9/4/2015 | 9/4/2015 | P | PART |
Tony Young
|
|
|
slab pour cover, NW corner - keagan Phone #: ###-####,, special inspector on site
|
BLD-Foundation | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | PART |
Tony Young
|
|
|
rebar; Kevin Phone #: ###-####,, SI on site
|
BLD-Foundation | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####,, piers ok
|
BLD-Foundation | 8/11/2015 | 8/13/2015 | 8/13/2015 | P | DONE |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Completed in the am.
|
BLD-Footing | 8/12/2015 | 8/13/2015 | 8/13/2015 | A | PART |
Mike Jordan
|
|
|
Late morning if possible // Kevin Phone #: ###-####. Work in progress. Special inspector on site. Need to verify that special inspector is ICC certified.
|
BLD-Footing | 8/11/2015 | 8/12/2015 | 8/12/2015 | P | PART |
Tony Young
|
|
|
Kevin Phone #: ###-####,, SP. INSP. will be on site
|
BLD-Foundation | 8/7/2015 | 8/7/2015 | 8/7/2015 | P | PASS |
Dave Hannah
|
|
|
rebar; Kevin Phone #: ###-####
|
BLD-Footing | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | PASS |
Tony Young
|
|
|
Rebar // Kevin Phone #: ###-####
|
BLD-Foundation | 7/30/2015 | 8/3/2015 | 8/3/2015 | A | PART |
Tony Young
|
|
|
Rebar // Kevin Phone #: ###-####,, exterior footings,, special inspector will be on site
|