Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-00697
StatusFinaled
Name BAKER CONSTRUCTION
Site Address 421 N COLE RD
Project NameTOWN SQUARE
Customer Number 
ePlanReviewYes
Description
(WASHINGTON FEDERAL) For tenant improvements to an existing 5,569 sq. ft. building to devide it into two tenant spaces with Washington Federal occupying the 2,370 sq. ft. space for their banking operations. The remaining space will remain vacant and require a separate building permit for occupancy. Work will include the removal of some interior finishes construction of new interior nonbearing partition walls to create two new ADA restrooms a and a copy area. New lighting will be install and modifications to the mechanical system will be made as well as the installation of related interior finishes. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/8/20157/9/20157/9/2015APASS
DetailsMike Jordan
Joel Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection7/8/20157/8/20157/8/2015PPASS
DetailsTroy Cobbley
Life safety passed. Request to Exit button has been installed at doors and has been tested.
FIRE-Final Inspection7/7/20157/7/20157/7/2015PFAIL
DetailsTroy Cobbley
All items have been addressed except the door mags at the main entrance. Per my conversation with Carl in plan review the door mags need to be code compliant and tested.
FIRE-Final Inspection6/30/20156/30/20156/30/2015PFAIL
DetailsTroy Cobbley
Repair exit sign, provide annual inspection tag for the fire extinguisher, remove dead bolt at the top of the exit door, meet IFC and IBC requirements for door magnets that have been installed on the exit doors.
BLD-Final6/29/20156/30/20156/30/2015ANR
DetailsMike Jordan
Joel Phone #: ###-####. Needs fire/life/safety final.
BLD-Ceiling Grid Inspection5/29/20156/1/20156/1/2015APART
DetailsMike Jordan
Joel Phone #: ###-####. ceiling grid ok, pending electrucal and mech. rough in inspections.
BLD-Energy code compliance4/28/20154/29/20154/29/2015APASS
DetailsMike Jordan
Joel Phone #: ###-####
BLD-Framing/Rough-in4/23/20154/24/20154/24/2015APASS
DetailsMike Jordan
Joel Phone #: ###-####
BLD-Framing/Rough-in4/20/20154/21/20154/21/2015ANR
DetailsMike Jordan
Joel Phone #: ###-####. Needs rough in inspections.