BLD-Final | 11/3/2016 | 11/3/2016 | 11/3/2016 | P | PASS |
Tony Young
|
|
|
Joel Phone #: ###-####,, ok for perm occ.
|
FIRE-Final Inspection | 11/2/2016 | 11/3/2016 | 11/3/2016 | A | PASS |
Katie Marron
|
|
|
Life safety pass. Fire Lane sign posted at rules board. No FE required.
|
BLD-Final | 8/22/2016 | 8/23/2016 | 8/23/2016 | P | PART |
Tony Young
|
|
|
Joel Phone #: ###-####,, ok pending final letter of affidavit on all special inspections and engineering
|
FIRE-Final Inspection | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | FAIL |
Jim Page
|
|
|
City approved drawings with small documentation not on site at time of inspection, city approved drawings and small documentation need to be onsite for inspection. Need to have signage installed for no parking fire lane, no signage installed at time of inspection. Need to verify if the 3 new structures (two covered outdoor seating area's and one restroom building) require fire extinguishers, based on labeled occupancy type of A3 and B fire extinguishers should be installed for each structure.
|
BLD-Aging Inspection | 7/21/2016 | 7/21/2016 | 7/22/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/20/2016 | 7/20/2016 | 7/22/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 3/8/2016 | 3/8/2016 | 3/8/2016 | P | PART |
Tony Young
|
|
|
Nick Phone #: ###-####,, rest room roof and ceiling ok to cover
|
BLD-Footing | 11/11/2015 | 11/12/2015 | 11/12/2015 | A | PART |
Tony Young
|
|
|
As early as possible Phone #: 2086088340 >> Inspection requested via mobile web by Ryan Casch ,, channel crossing bridge,, cut off walls,, ok pending S. I report
|
BLD-Foundation | 11/4/2015 | 11/5/2015 | 11/5/2015 | A | PART |
Tony Young
|
|
|
Rebar // Rayn Phone #: ###-####,, rest room footings,, work in progress,, ok pending special inspector report
|
BLD-Foundation | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | PASS |
Phil Shearer
|
|
|
Rebar; Ryan Phone #: ###-####
|
BLD-Foundation | 10/27/2015 | 10/28/2015 | 10/28/2015 | P | PART |
Tony Young
|
|
|
Ryan Phone #: ###-####,, ok pending special inspection
|
BLD-Foundation | 10/22/2015 | 10/23/2015 | 10/23/2015 | A | PASS |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. COlumn pad footings for Shelter B ok. Will have special inspection as well.
|
BLD-Foundation | 10/16/2015 | 10/16/2015 | 10/16/2015 | P | PASS |
Dave Hannah
|
|
|
rebar; Ryan Phone #: ###-####
|
BLD-Concrete | 7/31/2015 | 7/31/2015 | 8/3/2015 | P | PART |
Dave Hannah
|
|
|
Approved fishing dock abutment for concrete placement. 3rd party inspection had been performed and passed on geotech and reinforced concrete. Contractor was informed that they were proceeding at own risk as permit has not been issued. Inspection request made by John Tensen/Jim Wylie.
|