BLD-Final | 7/28/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-####
|
FIRE-Final Inspection | 7/28/2015 | 7/29/2015 | 7/29/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Conference | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | DONE |
Phil Shearer
|
|
|
Dan Phone #: ###-####
|
BLD-Final | 7/23/2015 | 7/24/2015 | 7/24/2015 | P | NR |
Phil Shearer
|
|
|
Dan Phone #: ###-####
|
FIRE-Final Inspection | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | FAIL |
Troy Cobbley
|
|
|
Previous corrections have been addressed however there are issues with the project related fire alarm permit. The life safety can be finaled when the fire alarm permit is passed.
|
BLD-Final | 7/8/2015 | 7/9/2015 | 7/9/2015 | P | PART |
Phil Shearer
|
|
|
For temp - Dan Phone #: ###-####. OK for temp
|
FIRE-Final Inspection | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | PART |
Jim Page
|
|
|
TCO authorized per conversation with Scott Arellano for stocking of shelves/employee training for 30 days, no public access under TCO. Emergency egress lighting tested/operational, fire extinguishers in place, exit signs noted on city approved plans are in place. Instructed general contractor the discharge landings need egress lighting installed, exit sign needs to be installed over doorway discharging from storage/cooler area to main floor, will verify at final tenant inspection.
|
BLD-Energy code compliance | 6/16/2015 | 6/17/2015 | 6/17/2015 | P | PASS |
Jim Sly
|
|
|
Glen Phone #: ###-####
|
BLD-Framing/Rough-in | 6/15/2015 | 6/16/2015 | 6/16/2015 | A | PASS |
Phil Shearer
|
|
|
Glen Phone #: ###-####
|