BLD-Final | 10/30/2015 | 10/30/2015 | 10/30/2015 | P | PASS |
Jim Storey
|
|
|
no card on site
|
BLD-Final | 9/25/2015 | 9/28/2015 | 9/28/2015 | A | DONE |
Jim Storey
|
|
|
Steve Phone #: ###-####
|
BLD-Final | 9/24/2015 | 9/28/2015 | 9/28/2015 | A | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-#### // change day and time per Steve from K2 final ok pending others
|
FIRE-Final Inspection | 9/24/2015 | 9/25/2015 | 9/25/2015 | P | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
BLD-Conference | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | DONE |
Jim Storey
|
|
|
Steve Phone #: ###-#### occ load sign all sign offs
|
BLD-Wall Bracing | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | PASS |
Jim Storey
|
|
|
Steve-wall barrier Phone #: ###-#### c/n made ok vapor above ceilling ok
|
BLD-Ceiling Grid Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 | P | PASS |
Jim Storey
|
|
|
Steve-wall barrier Phone #: ###-#### pending others ok to cover
|
BLD-Ceiling Grid Inspection | 9/3/2015 | 9/8/2015 | 9/8/2015 | A | NR |
Mike Jordan
|
|
|
Steve Phone #: ###-####. Needs electrical and mech. rough in inspections first.
|
BLD-Energy code compliance | 8/11/2015 | 8/12/2015 | 8/12/2015 | A | PASS |
Jim Storey
|
|
|
Steve-wants 1st thing AM Phone #: ###-#### above ceilling need vapor barrior to meet flame spread.
|
BLD-Framing/Rough-in | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | PASS |
Jim Storey
|
|
|
Late morning - Steve Phone #: ###-####
|
BLD-Wall cover | 7/31/2015 | 8/3/2015 | 8/3/2015 | A | PASS |
Jim Storey
|
|
|
nailing for roof also // Steve Phone #: ###-#### hd at restarm ok to cover
|
BLD-Other | 7/20/2015 | 7/21/2015 | 7/21/2015 | P | PASS |
Jim Storey
|
|
|
slab on grade reinforcement - Steve Phone #: ###-####
|
BLD-Footing | 7/9/2015 | 7/10/2015 | 7/10/2015 | A | PASS |
Jim Storey
|
|
|
rebar for stem walls, requesting 11 AM - Steve Phone #: ###-#### si on site
|
BLD-Foundation | 7/7/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Jim Storey
|
|
|
Change day Per Steve-rebar Phone #: ###-####
|