Description
(U-HAUL CLIMATE CONTROL STORAGE BUILDING) Permit to construct a new 37,616 square foot two story climate controlled storage building and related site improvements. The building is fully fire sprinklered for S-1 Fire area provisions. Approval contingent upon adhering to the approved plans on file, Planning Approvals and engineering. Work to include: construction of new foundation, new accessible parking, new accessible route, [construction of a tilt up concrete first floor, steel pan deck, and metal building second floor and roof structure], new electrical, new mechanical, new plumbing, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building will be fully Fire Sprinklered with an approved Fire Alarm system per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/201610/31/201611/2/2016PPASS
DetailsJim Sly
Jake Phone #: ###-####
OK for Perm Occ. (sorry....he didn't have card)
FIRE-Final Inspection11/2/201611/3/201611/2/2016APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection11/2/201611/2/201611/2/2016PFAIL
DetailsTroy Cobbley
Still need the emergency light on the second floor northwest corner repaired. All other items have been corrected.
FIRE-Final Inspection10/31/201611/1/201611/1/2016AFAIL
DetailsTroy Cobbley
Provide correct building address for the fire alarm monitoring, repair three emergency lights, install the missing exit sign, provide fire dept access signage. Per contractor the shown gate/fencing will not be installed.
BLD-Ceiling Grid Inspection9/15/20169/15/20169/15/2016PPASS
DetailsJim Sly
Keagan Phone #: ###-####
FIRE-Conference9/15/20169/15/20169/15/2016ADONE
DetailsKatie Marron
Phone call with Jake on where Knox box should be installed (entrance or riser room). Advised it should be installed by where the fire alarm panel will be which is he said is the main entrance.
BLD-Framing/Rough-in8/31/20169/1/20169/2/2016PPASS
DetailsJim Sly
Jake Phone #: ###-####
FIRE-Conference9/2/20169/2/20169/2/2016PDONE
DetailsTroy Cobbley
Jake Phone #: ###-####
BLD-Energy code compliance8/18/20168/18/20168/19/2016PPART
DetailsJim Sly
Jake Phone #: ###-####
West wall 2nd floor OK.
BLD-Energy code compliance8/10/20168/11/20168/11/2016APART
DetailsJim Sly
Insulation // Jake Phone #: ###-####
South Wall 2nd floor...OK.
BLD-Energy code compliance8/3/20168/3/20168/3/2016PPART
DetailsJim Sly
Jake Phone #: ###-####
Select walls ....OK
BLD-Energy code compliance8/1/20168/1/20168/1/2016PPART
DetailsJim Sly
Jake Phone #: ###-####
West wall 1st floor.......OK
BLD-Energy code compliance6/30/20167/1/20167/1/2016ANR
DetailsJim Sly
Please call ahead for access - Jake Phone #: ###-####
BLD-Other6/17/20166/20/20166/20/2016PPART
DetailsJim Storey
Jake-steel deck-concrete Phone #: ###-####wip
BLD-Conference5/10/20165/10/20165/10/2016PDONE
DetailsJim Sly
Jake Phone #: ###-####
BLD-Footing3/22/20163/23/20163/23/2016APART
DetailsJim Sly
Late morning // Jake Phone #: ###-####
Special insp Required .......Footing pads at East and West walls of Bldg.......and just S. of Elevator. Elevator footing. OK pending MTI special inspections, tests and approvals.