BLD-Final | 8/8/2016 | 8/8/2016 | 8/8/2016 | A | PASS |
Mike Jordan
|
|
|
Please give notice so I can meet you there. Thanks Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
|
DOC - Permit Finaled | 8/8/2016 | 8/8/2016 | 8/8/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 3/11/2016 | 3/14/2016 | 3/14/2016 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 3/7/2016 | 3/8/2016 | 3/8/2016 | A | PASS |
Mike Jordan
|
|
|
would like call ahead; scott Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2016 | 2/29/2016 | 2/29/2016 | A | FAIL |
Mike Jordan
|
|
|
Scott Phone #: ###-####. HAngars require full depth blocking and need to be double on A5 trusses, do not reuse these hanhars (overdriven). Nail off 2ply B3 girder as per the engineering. Complete lateral bracing on A4,A5 B1,B2 and B3 trusses. Appears that interior bearing on A5 trusses is off. Top chord wood penetration at 2hr. fire wall? A correction notice was issued.
|
BLD-Framing/Rough-in | 2/23/2016 | 2/24/2016 | 2/24/2016 | P | FAIL |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Provide truss engineering. 2hr. fire wall to continue to under side of roof deck. Provide truss hanhars for truss to girder truss connections. Nail off 2ply girder trusses.
|
BLD-Wall Bracing | 1/6/2016 | 1/7/2016 | 1/7/2016 | A | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
BLD-Foundation | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
BLD-Footing | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | PASS |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|