BLD-Final | 1/20/2017 | 1/20/2017 | 1/20/2017 | P | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####
|
FIRE-Final Inspection | 8/19/2016 | 8/19/2016 | 8/19/2016 | P | PASS |
Jim Page
|
|
|
No fire sprinklers in clubhouse, fire alarm inspection for clubhouse complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for clubhouse passed/complete.
|
BLD-Final | 7/20/2016 | 7/25/2016 | 7/25/2016 | A | CANC |
Tony Young
|
|
|
Ed Phone #: ###-####,, needs f/l/s
|
FIRE-Final Inspection | 7/21/2016 | 7/22/2016 | 7/22/2016 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, Ed Phone #: ###-####. Fire alarm contractor has to make changes to the audio visual devices located in the bathrooms with the showers, when modifications are completed a final fire alarm inspection will be called in to coincide with the final life fire safety inspection.
|
FIRE-Final Inspection | 7/18/2016 | 7/19/2016 | 7/19/2016 | A | CANC |
Jim Page
|
|
|
Final life fire safety inspection could not be completed, this BLD permit has an FIR permit that is not attched under project related cases, FIR16-00380, permit is still under review. FIR permit needs to be in issued status for final life fire safety inspection can be performed, inspection request cancelled.
|
BLD-Framing/Rough-in | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, gazeboes okay
|
BLD-Final | 6/27/2016 | 6/28/2016 | 6/28/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, temp occ ok on clubhouse,, (pending trades) also need to verify address as 7570 w State,, need other projects on permit finished also,, need tempered glass and to verify 45 minute rated door (need paint removed from lable) at laundry prior to full occupancy
|
BLD-Final | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | NR |
Tony Young
|
|
|
Ed Phone #: ###-####,, club house only.. walk through only,, need temp glass,, fire door,, trades/ signoffs,,, exit lights,, ADA requirements,, address verification,, pass through hardware,, etc.. see Ed for list
|
BLD-Footing | 4/25/2016 | 4/26/2016 | 4/26/2016 | A | PASS |
Jim Sly
|
|
|
Gazebo footings - Ed Phone #: ###-#### OK pending Geotech special inspections, tests and approvals.
|
BLD-Framing/Rough-in | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | DONE |
Tony Young
|
|
|
Ed Phone #: ###-####
|
BLD-Wall Bracing | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | PASS |
Jim Sly
|
|
|
Ed Phone #: ###-####
|
BLD-Wall Bracing | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | CANC |
Jim Sly
|
|
|
Ed-outside shear Phone #: ###-####
|
BLD-Wall cover | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | PASS |
Tony Young
|
|
|
Fire // Ed Phone #: ###-####,, laundry firewall (2 layer) ok
|
BLD-Wall cover | 3/4/2016 | 3/7/2016 | 3/7/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,,, club house drywall,, ok,, osb shearwalls in place already
|
BLD-Energy code compliance | 2/29/2016 | 3/1/2016 | 3/1/2016 | A | PASS |
Jim Sly
|
|
|
Ed Phone #: ###-####
|
BLD-Framing/Rough-in | 2/25/2016 | 2/26/2016 | 2/26/2016 | A | PEND |
Tony Young
|
|
|
Ed Phone #: ###-####,, frame corrections made ok ,, still need mechanical pass
|
BLD-Wall Bracing | 2/25/2016 | 2/26/2016 | 2/26/2016 | A | PASS |
Tony Young
|
|
|
Shear // Ed Phone #: ###-####,, club house ok,, exterior
|
BLD-Framing/Rough-in | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | PART |
Jim Sly
|
|
|
C/N Nail hanger in laundry, Titen bolts in bottom plates, Fireblock at ceiling line...Fireplace, Bathroom.......install Holddowns at ext. walls. OK to insulate if not covering Mech. Need Mech rough-in.
|
BLD-Other | 2/22/2016 | 2/22/2016 | 2/22/2016 | P | PASS |
Tony Young
|
|
|
Nailing for roof // Ed Phone #: ###-####
|
BLD-Footing | 1/11/2016 | 1/12/2016 | 1/12/2016 | A | PART |
Tony Young
|
|
|
Ed/// Inspection for Building O Phone #: ###-####,, west side ok,, special on site
|
BLD-Other | 12/28/2015 | 12/29/2015 | 12/29/2015 | A | PART |
Tony Young
|
|
|
Earlier the better fo Pre-slab, vapor barrier, activity center - Edmore Phone #: ###-####,, special inspector on site,, will tent and heat for concrete cure
|
BLD-Footing | 12/14/2015 | 12/16/2015 | 12/16/2015 | A | PART |
Tony Young
|
|
|
Barry-pour time 11:30 Phone #: ###-####,, building "T",, pending special inspection report
|