BLD-Final | 3/22/2017 | 3/23/2017 | 3/24/2017 | P | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####
|
FIRE-Final Inspection | 3/22/2017 | 3/23/2017 | 3/23/2017 | A | PASS |
Jim Page
|
|
|
Previous issues with fire alarm system have been resolved, final life fire safety inspection passed/complete.
|
BLD-Aging Inspection | 3/13/2017 | 3/13/2017 | 3/14/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 1/11/2017 | 1/11/2017 | 1/11/2017 | P | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, temp occ ok,, trades,, stairs
|
FIRE-Final Inspection | 1/11/2017 | 1/11/2017 | 1/11/2017 | P | PART |
Jim Page
|
|
|
Partial final inspection complete for life fire safety, (TCO authorized on life fire safety per conversation with Scott Arellano) fire sprinkler inspection complete, partial completion for fire alarm system (contractor is troubleshooting sync issue on level 4, fire alarm permit will remain in issued status until issue is resolved), knox box is in place, fire extinguishers are in place with current inspection tags. Fire life safety can be finaled when FIR permit for fire alarms is complete.
|
BLD-Energy code compliance | 11/1/2016 | 11/2/2016 | 11/2/2016 | A | PASS |
Tony Young
|
|
|
1st floor; Ed Phone #: ###-####,, building Q 1st or main floor ok
|
BLD-Framing/Rough-in | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Tony Young
|
|
|
Ed// 1st floor Phone #: ###-####
|
BLD-Framing/Rough-in | 10/31/2016 | 11/1/2016 | 11/1/2016 | A | PART |
Tony Young
|
|
|
Ed// 1st floor Phone #: ###-####,, needs mech pass 1st,, ok to insulate unaffected areas
|
BLD-Energy code compliance | 10/28/2016 | 10/31/2016 | 10/31/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, 2nd floor ok
|
BLD-Framing/Rough-in | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, 2nd floor ok
|
BLD-Energy code compliance | 10/21/2016 | 10/24/2016 | 10/24/2016 | A | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####
|
BLD-Framing/Rough-in | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | PART |
Tony Young
|
|
|
3rd floor; Ed Phone #: ###-####,, corrections in paint,, ok to insulate
|
BLD-Energy code compliance | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####,, 4th floor
|
BLD-Energy code compliance | 9/19/2016 | 9/20/2016 | 9/20/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, 4th floor,, ok pending fire sprinkler pass on 4th floor
|
BLD-Energy code compliance | 9/19/2016 | 9/19/2016 | 9/19/2016 | P | NR |
Tony Young
|
|
|
Ed Phone #: ###-####,, 4th floor,, needs tenting approval on sprinklers
|
BLD-Framing/Rough-in | 9/14/2016 | 9/15/2016 | 9/15/2016 | A | PART |
Jim Sly
|
|
|
Ed// 4th floor Phone #: ###-#### Framing OK.......Told Contr. to call us so we can look at Draftstops when completed.
|
BLD-Energy code compliance | 7/13/2016 | 7/14/2016 | 7/14/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, building Q plumbing walls ok
|
BLD-Wall Bracing | 7/11/2016 | 7/12/2016 | 7/12/2016 | A | PASS |
Tony Young
|
|
|
Ed-interior Shear Phone #: ###-####,, interior shear ok,, work in progress,, ok
|
BLD-Wall Bracing | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, exterior shear ok building Q
|
BLD-Footing | 4/5/2016 | 4/6/2016 | 4/6/2016 | A | PART |
Jim Sly
|
|
|
Insulation // Ed Phone #: ###-#### South 3rd of Bldg........OK pending Geo Tech special inspection, tests and approvals.
|
BLD-Footing | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | PEND |
Tony Young
|
|
|
Ed Phone #: ###-####,, ok pending special inspection
|