Permit Information
Permit NumberBLD15-01112
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7568 W SAXTON DR
Project NameThe Kensington Apartments O
Customer NumberBLD15-01107 IN EPLAN
ePlanReview 
Description
(THE KENSINGTON APARTMENTS - BUILDING O) The drawings are filed under BLD15-01107 in ePlanReview. The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 19,568 square foot four story apartment building (5,243 sq. ft. 1st story with four 2.c units, 5,192 sq. ft. 2nd story with four 2.c units, 5,192 sq. ft. 3rd story with four 2.c units, and 3,941 sq. ft. 4th story with four 1.d units). All ground floor units are required to comply as Type B dwelling units. No elevator is provided in this building. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, 1-hr dwelling unit separations, .5-hr minimum fire-resistance-rated corridors with 20 minute smoke- and draft-control doors, exterior exit stairways fire rated like the corridor, steel stairways with concrete treads, interior nonbearing walls, millwork, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/22/20173/23/20173/23/2017PPASS
DetailsTony Young
Ed Phone #: ###-####
FIRE-Final Inspection3/22/20173/23/20173/23/2017APASS
DetailsJim Page
Final life fire safety inspection passed/complete
BLD-Aging Inspection3/8/20173/8/20173/10/2017 PASS
DetailsTony Young
BLD-Aging Inspection1/6/20171/6/20171/11/2017 PEND
DetailsTony Young
BLD-Final8/29/20168/30/20168/31/2016APEND
DetailsTony Young
Ed Phone #: ###-####
BLD-Final8/26/20168/29/20168/29/2016ANR
DetailsTony Young
Ed Phone #: ###-####,,still need stairs reworked
BLD-Final8/25/20168/26/20168/26/2016APEND
DetailsTony Young
Ed Phone #: ###-####
BLD-Final8/24/20168/25/20168/25/2016APART
DetailsTony Young
Ed Phone #: ###-####,, temp occ ok,, need door labels, guard rail permanent fix, stair permanent fix rise and run, and final letter of ok on all special inspections, and full sign off from fire sprinkler
BLD-Final8/24/20168/24/20168/24/2016PDEFR
DetailsTony Young
Ed Phone #: ###-####,, to AM
BLD-Framing/Rough-in8/23/20168/24/20168/24/2016ADONE
DetailsTony Young
Ed Phone #: ###-####,, walk through on final... frame has been done
FIRE-Final Inspection8/23/20168/24/20168/24/2016APART
DetailsJim Page
Partial final life fire safety inspection passed/complete, fire sprinkler inspection is partially complete, reference to activites under FIR16-00028 for fire sprinkler comments. Dry standpipe inspection for this building is complete. Partial final inspection complete for fire alarm system, reference activities under FIR16-00400 for fire alarm comments. A partial final for life fire safety inspection is complete, monitored heat trace associated with fire alarm and fire sprinkler system needs to be installed and inspected/passed for life fire safety to be finaled. Fire extinguishers are in place with current inspection tags. A 60 day TCO is authorized per conversation with Scott Arellano.
FIRE-Final Inspection8/18/20168/19/20168/19/2016AFAIL
DetailsJim Page
Need to have fire sprinkler and fire alarm permits finaled, apartments need to have suite identification installed.
BLD-Final8/18/20168/19/20168/19/2016PNR
DetailsJim Sly
Ed Phone #: ###-####
Need ACHD Zoning Etc........
BLD-Footing8/16/20168/17/20168/17/2016APART
DetailsJim Sly
Ed Phone #: ###-####
2 light pole footings.....OK.
BLD-Framing/Rough-in6/2/20166/3/20166/3/2016APART
DetailsTony Young
3rd floor framing - Ed Phone #: ###-####,, insulation ok also on 3rd floor
BLD-Framing/Rough-in6/2/20166/2/20166/3/2016PPART
DetailsTony Young
3rd floor framing - Ed Phone #: ###-####,, 3rd floor ok to cover
BLD-Framing/Rough-in6/1/20166/2/20166/2/2016ANR
DetailsTony Young
3rd floor framing - Ed Phone #: ###-####,, needs mech 1st
BLD-Energy code compliance5/31/20166/1/20166/1/2016APART
DetailsTony Young
2nd & 3rd floor insulation - Ed Phone #: ###-####,, 2nd floor ok to cover,, need mech on 3rd,, then ok
BLD-Framing/Rough-in5/31/20166/1/20166/1/2016APART
DetailsTony Young
3rd floor framing - Ed Phone #: ###-####,, needs mechanical 1st
BLD-Framing/Rough-in5/31/20165/31/20165/31/2016PPART
DetailsJim Sly
Ed-2nd floor blg 0 Phone #: ###-####
Fir downs and insulation 2nd floor......OK to rock pending all trades....OK
BLD-Energy code compliance5/26/20165/27/20165/27/2016PPASS
DetailsTony Young
Ed// 1st floor Phone #: ###-####
BLD-Framing/Rough-in5/26/20165/27/20165/27/2016PPASS
DetailsTony Young
Ed// 1st floor Phone #: ###-####
BLD-Energy code compliance5/25/20165/26/20165/26/2016APART
DetailsTony Young
Ed// 1st floor Phone #: ###-####,, work in progress,, need mech
BLD-Framing/Rough-in5/25/20165/26/20165/26/2016APART
DetailsTony Young
Ed// 1st floor Phone #: ###-####,, ok pending mechanical
BLD-Energy code compliance5/6/20165/9/20165/9/2016APART
DetailsTony Young
Insulation // Ed Phone #: ###-####,, ok to cover drop down areas,, need fire sprinkler pass on other areas
BLD-Framing/Rough-in5/2/20165/3/20165/3/2016PPASS
DetailsJim Sly
Ed Phone #: ###-####
BLD-Framing/Rough-in4/28/20164/29/20164/29/2016APART
DetailsTony Young
Prior to insulation - Ed Phone #: ###-####,, ok to cover areas for furr downs
BLD-Conference4/29/20164/29/20164/29/2016PPART
DetailsJim Sly
Prior to insulation - Ed Phone #: ###-####
Met with superintendant, framer, fire caulker and Tony Young .....Walk thru.....1st of several bldgs.
BLD-Wall Bracing3/25/20163/25/20163/25/2016PPASS
DetailsTony Young
building 0,, exterior ok after some fixes
BLD-Energy code compliance3/17/20163/18/20163/18/2016APASS
DetailsTony Young
Ed-interior insulation for plumbing walls Phone #: ###-####
BLD-Wall Bracing3/16/20163/17/20163/17/2016APART
DetailsTony Young
Ed-interior shear Phone #: ###-####,, plumbing walls ok to insulate
BLD-Other3/10/20163/11/20163/11/2016APASS
DetailsTony Young
Roof // Ed Phone #: ###-####,, roof nailing appears ok
BLD-Footing1/21/20161/21/20161/21/2016PPART
DetailsJim Sly
Barry Phone #: ###-####
OK pending Geotek special inspection, tests and approvals.
BLD-Foundation1/7/20161/8/20161/8/2016APART
DetailsMike Jordan
Barry Phone #: ###-####. Work in progress. Pending special inspection.
BLD-Footing1/7/20161/8/20161/8/2016APART
DetailsMike Jordan
Barry Phone #: ###-####. Work in progress. Pending special inspection.
BLD-Footing11/25/201511/30/201511/30/2015APART
DetailsTony Young
Ed Phone #: ###-####,, pending special inspection