Permit Information
Permit NumberBLD15-01116
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7674 W SAXTON DR
Project NameThe Kensington Apartments V
Customer NumberBLD15-01107 IN EPLAN
ePlanReview 
Description
(THE KENSINGTON APARTMENTS - BUILDING V) The drawings for site work (civil, landscaping, lawn sprinklers, site electrical, site plumbing, etc.) are filed under BLD15-01107 in ePlanReview. The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 29,932 square foot three story apartment building (10,389 sq. ft. 1st story with eight 2.a units, 10,389 sq. ft. 2nd story with eight 2.a units, and 9,154 sq. ft. 3rd story with four 2.a units and four 1.b units). All ground floor units are required to comply as Type B dwelling units. No elevator is provided in this building. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, 1-hr dwelling unit separations, .5-hr minimum fire-resistance-rated corridors with 20 minute smoke- and draft-control doors, exterior exit stairways fire rated like the corridor, steel stairways with concrete treads, interior nonbearing walls, millwork, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/24/20173/24/20173/24/2017PPASS
DetailsTony Young
Ed Phone #: ###-####
BLD-Final3/1/20173/1/20173/1/2017PPART
DetailsTony Young
Ed Phone #: ###-####,, temp occ. ok
BLD-Final2/28/20173/1/20173/1/2017ACANC
DetailsTony Young
Ed Phone #: ###-####
FIRE-Final Inspection2/28/20172/28/20172/28/2017PPASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are mounted with current inspection tags, knox box is in place. Final life fire safety inspection passed/complete.
BLD-Energy code compliance11/18/201611/21/201611/21/2016APASS
DetailsTony Young
Ed Phone #: ###-####,, 1st and 2nd floor
BLD-Energy code compliance11/17/201611/18/201611/18/2016APART
DetailsTony Young
Ed Phone #: ###-####,, need rims insulated
BLD-Framing/Rough-in11/16/201611/17/201611/17/2016APART
DetailsTony Young
Ed Phone #: ###-####,, 1st and 2nd floor pre rock drops ok to cover
BLD-Energy code compliance10/25/201610/26/201610/26/2016APART
DetailsTony Young
Ed-1st and 2nd floors Phone #: ###-####,, pre rock areas ok to insulate
BLD-Energy code compliance10/21/201610/24/201610/24/2016APASS
DetailsTony Young
3rd floor // Berry Phone #: ###-####
BLD-Energy code compliance10/21/201610/21/201610/22/2016PPASS
DetailsTony Young
Ed Phone #: ###-####,, 3rd floor
BLD-Energy code compliance10/20/201610/21/201610/21/2016ANR
DetailsTony Young
Ed Phone #: ###-####
BLD-Framing/Rough-in10/19/201610/20/201610/21/2016PPEND
DetailsTony Young
Ed Phone #: ###-####,, 3rd floor,, ok pending sprinkler pass
BLD-Framing/Rough-in10/18/201610/19/201610/19/2016APART
DetailsTony Young
Ed Phone #: ###-####,, 3rd floor only.. need sprinkler pass on 3rd floor,, ok to insulate the walls
BLD-Energy code compliance8/23/20168/24/20168/24/2016APART
DetailsTony Young
Ed Phone #: ###-####,, plumbing walls ok
BLD-Wall Bracing8/22/20168/23/20168/23/2016APASS
DetailsTony Young
Ed// exterior and interior shear panel- every floor Phone #: ###-####
BLD-Footing5/23/20165/24/20165/24/2016APART
DetailsTony Young
Ed Phone #: ###-####,, interior footings,, pending special inspection
BLD-Other5/17/20165/18/20165/18/2016APASS
DetailsJim Sly
Ed-underfloor concrete Phone #: ###-####
Pending Geotech special insp, tests and approvals.
BLD-Footing4/13/20164/14/20164/14/2016APART
DetailsTony Young
Ed Phone #: ###-####,, pending special inspection report