BLD-Final | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####
|
BLD-Final | 10/9/2017 | 10/9/2017 | 10/10/2017 | P | PART |
Jim Sly
|
|
|
Ed Phone #: ###-#### Structural final only.....OK. OK for Perm Occ when all required sigatures are obtained for Perm Occ.
|
FIRE-Final Inspection | 10/9/2017 | 10/9/2017 | 10/9/2017 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is located by the fire sprinkler riser room. Final life fire safety inspection passed/complete.
|
BLD-Energy code compliance | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####
|
BLD-Other | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Tony Young
|
|
|
Fire colcking // Ed Phone #: ###-####
|
BLD-Framing/Rough-in | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####,, ok pending trades
|
BLD-Energy code compliance | 7/20/2017 | 7/21/2017 | 7/21/2017 | P | PART |
Tony Young
|
|
|
Insulation // Ed Phone #: ###-####,, drop areas ok on main floor
|
BLD-Energy code compliance | 6/28/2017 | 6/29/2017 | 6/29/2017 | P | PART |
Dave Hannah
|
|
|
Ed Phone #: ###-#### second floor ok to cover
|
BLD-Energy code compliance | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
Tony Young
|
|
|
Second floor and fire colk. /// Ed Phone #: ###-####
|
BLD-Framing/Rough-in | 6/26/2017 | 6/27/2017 | 6/27/2017 | A | PART |
Tony Young
|
|
|
Second floor and fire colk. /// Ed Phone #: ###-####,, ok to insulate,, needs fire passed
|
BLD-Framing/Rough-in | 6/26/2017 | 6/26/2017 | 6/26/2017 | P | NR |
Tony Young
|
|
|
Second floor and fire colk. /// Ed Phone #: ###-####,, needs sprinklers 1st
|
BLD-Wall Bracing | 6/19/2017 | 6/19/2017 | 6/19/2017 | P | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####,, exterior ok
|
BLD-Wall Bracing | 5/22/2017 | 5/22/2017 | 5/23/2017 | P | PART |
Tony Young
|
|
|
interior shear // Ed Phone #: ###-####, interior hold downs
|
BLD-Footing | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | PART |
Jim Sly
|
|
|
Ed Phone #: ###-#### OK pending Geotech special inspections, tests and approval.
|
BLD-Final | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | CANC |
Jim Sly
|
|
|
ed Phone #: ###-####
|