BLD-Final | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####
|
BLD-Final | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, temp occ ok
|
FIRE-Final Inspection | 5/16/2017 | 5/16/2017 | 5/16/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place. Final life fire safety inspection passed/complete.
|
BLD-Energy code compliance | 3/21/2017 | 3/22/2017 | 3/22/2017 | A | PASS |
Tony Young
|
|
|
Ed 1,2,3 floors Phone #: ###-####
|
BLD-Framing/Rough-in | 3/21/2017 | 3/21/2017 | 3/21/2017 | P | PASS |
Tony Young
|
|
|
Ed 1,2,3 floors Phone #: ###-####,, need a couple straps,, firecaulking around main sprinkler line inside above the doors
|
BLD-Energy code compliance | 3/14/2017 | 3/14/2017 | 3/14/2017 | P | PASS |
Tony Young
|
|
|
2nd & 3rd floors; Ed Phone #: ###-####
|
BLD-Energy code compliance | 3/9/2017 | 3/10/2017 | 3/10/2017 | A | PART |
Tony Young
|
|
|
1st and 2nd floor Engery // Ed Phone #: ###-####,, drop areas ok
|
BLD-Energy code compliance | 3/8/2017 | 3/8/2017 | 3/8/2017 | P | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, 4th floor ok
|
BLD-Energy code compliance | 3/7/2017 | 3/8/2017 | 3/8/2017 | A | NR |
Tony Young
|
|
|
Ed Phone #: ###-####,, 4th floor
|
BLD-Other | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | DONE |
Tony Young
|
|
|
Ed Phone #: ###-####,, fire caulking in drops areas all floors,,
|
BLD-Framing/Rough-in | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, fire caulking ok,, ok to insulate drops areas
|
BLD-Energy code compliance | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PART |
Tony Young
|
|
|
1st - 4th floor // Ed Phone #: ###-####,, seal pack ok
|
BLD-Other | 3/3/2017 | 3/6/2017 | 3/6/2017 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, fire caulking in drops areas all floors,, // frame corrections made ok,, work in progress on fire caulking
|
BLD-Framing/Rough-in | 3/2/2017 | 3/3/2017 | 3/3/2017 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, pre insulation areas for drops,, ok to start fire caulking and insulation after trades rough pass,, need to verify fire caulking
|
BLD-Wall Bracing | 12/1/2016 | 12/2/2016 | 12/2/2016 | P | PART |
Jim Sly
|
|
|
Shear // Ed Phone #: ###-#### Select interior walls ok to insulate and cover
|
BLD-Wall Bracing | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Tony Young
|
|
|
Ed Phone #: ###-####,, exterior ok
|
BLD-Concrete | 8/24/2016 | 8/25/2016 | 8/25/2016 | A | PART |
Tony Young
|
|
|
Ed Phone #: ###-####,, slab work,, pending special inspection report
|
BLD-Foundation | 7/28/2016 | 7/29/2016 | 7/29/2016 | A | PASS |
Mike Jordan
|
|
|
Ed Phone #: ###-####
|
BLD-Footing | 7/19/2016 | 7/19/2016 | 7/19/2016 | P | PASS |
Phil Shearer
|
|
|
Ed Phone #: ###-####.
|