Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD15-01131
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7788 W SAXTON DR
Project NameThe Kensington Apt. Bldg. X
Customer NumberSEE "COMMENTS" FIELD
ePlanReview 
Description
(THE KENSINGTON APARTMENTS – BUILDING X – UNIT 3.e – 1ST UNIT FROM NORTH) (DRH14-00349) (PUD14-00003) The drawings for a total of 23 Townhouses, each having a separate permit, are filed under permit BLD15-01119 in ePlanReview. This building is not required to have a fire sprinkler system. To construct a 2 story townhome having a total floor area of about 2,094 square feet (1,090 square feet 1st story and 1,004 square feet 2nd story) and 3 bedrooms and a garage in compliance with the 2012 IRC. Because it has two stories, it is not required to comply as a Type B dwelling unit. Work is to include concrete footings, concrete foundations, concrete slab on grade, wood stud exterior bearing and shear walls, wood stud interior bearing and shear walls, wood floor joists, engineered wood trusses, a 2-hr property line wall where buildings are common, 1-hr property line walls where buildings are not common, fire rated roof sheathing protection in lieu of parapets, interior stairways, millwork, and finishes. All utilities that serve a townhome are required to be located on the same parcel as the townhome. Utilities serving one townhome (i.e. gas, water, sewer, electrical, telecommunications, etc.) are not allowed to cross over another parcel or through another townhome. At the utilities easement located either in front or in back of the parcel, the utilities are allowed to become common. The design for the wood roof trusses are a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/12/20181/12/20181/12/2018PPASS
DetailsTony Young
Ed Phone #: ###-####
FIRE-Final Inspection1/12/20181/12/20181/12/2018PPASS
DetailsTroy Cobbley
life safety passed

Ed Phone #: ###-####
BLD-Energy code compliance12/12/201712/12/201712/12/2017PPASS
DetailsJim Sly
Ed Phone #: ###-####
BLD-Framing/Rough-in12/4/201712/5/201712/5/2017PPART
DetailsTony Young
Ed Phone #: ###-####,, verify seal pack,, wip,, fix cut floor joist,, ok to insulate
BLD-Energy code compliance8/15/20178/15/20178/15/2017PPART
DetailsTony Young
Berry Phone #: ###-#### ,, insulation behind tubs/shower areas ok after fireblocking plate lines
BLD-Wall Bracing7/10/20177/11/20177/12/2017APART
DetailsTony Young
Shear // Ed Phone #: ###-####,, exterior
ok after fixes
BLD-Other5/18/20175/19/20175/19/2017APASS
DetailsTony Young
Concrete - Ed Phone #: ###-####,, slab and interior footings
BLD-Footing5/8/20175/8/20175/9/2017PPART
DetailsTony Young
Ed Phone #: ###-####,, pending special inspection