Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-01137
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7570 W SAXTON DR
Project NameThe Kensington Apartments G3
Customer NumberBLD15-01118 - 01137,16-00539 & 540
ePlanReview 
Description
(THE KENSINGTON APARTMENTS – GARAGE BUILDING #3) The drawings are filed under BLD15-01118 in ePlanReview. A fire sprinkler system is not required. To construct a 1,523 square foot garage building having three 255 square foot individual garages, one 377 square foot individual van accessible garage, and one 374 square foot maintenance room. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, interior nonbearing walls, a 1-hr property line wall, a 1-hr ceiling in lieu of a parapet, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/19/20181/22/20181/22/2018APASS
DetailsTony Young
Ed Phone #: ###-####
FIRE-Final Inspection1/22/20181/22/20181/22/2018PPASS
DetailsJim Page
Final life fire safety inspection for area of work complete.
BLD-Conference11/4/201611/4/201611/4/2016PPASS
DetailsTony Young
Ed Phone #: ###-####
BLD-Aging Inspection11/4/201611/4/201611/4/2016 PEND
DetailsTony Young
BLD-Aging Inspection11/3/201611/3/201611/4/2016 PASS
DetailsTony Young
BLD-Wall Bracing6/21/20166/22/20166/22/2016APART
DetailsTony Young
Ed Phone #: ###-####,, garage ok
BLD-Foundation5/11/20165/12/20165/12/2016APASS
DetailsPhil Shearer
Ed-preslab-garage Phone #: ###-#### OK pending Geotech special inspections, tests and approvals.
BLD-Foundation4/29/20165/2/20165/2/2016APASS
DetailsJim Sly
Ed Phone #: ###-####
OK pending Geotech Special insp, tests and approvals.
BLD-Footing4/27/20164/28/20164/28/2016APART
DetailsJim Sly
Ed Phone #: ###-####
OK pending Geotech special inspections, testrs and approvals.
BLD-Footing4/25/20164/26/20164/26/2016ACANC
DetailsTony Young
Ed Phone #: ###-####