BLD-Final | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | PASS |
Tony Young
|
|
|
Jason Phone #: ###-####,, bond is in place
|
BLD-Final | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | NR |
Tony Young
|
|
|
Jason Phone #: ###-####,, walk through only,, need tempered glass in stairwell,, need PW hillside
|
BLD-Wall Bracing | 6/7/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Tony Young
|
|
|
interior shear,, Jason// please call before Phone #: ###-####
|
BLD-Other | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PART |
Tony Young
|
|
|
soffits,, Jason// please call before Phone #: ###-####,, work in progress,, ok
|
BLD-Energy code compliance | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | DONE |
Tony Young
|
|
|
Jason// please call before Phone #: ###-####,, soffits,, work in progress,, ok
|
BLD-Energy code compliance | 5/31/2016 | 5/31/2016 | 5/31/2016 | P | PASS |
Phil Shearer
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | PART |
Tony Young
|
|
|
Jason Phone #: ###-####,, ok to insulate,, need a fix on rear deck support,, missed layout
|
BLD-Wall Bracing | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Tony Young
|
|
|
Shear // Jason Phone #: ###-####,, exterior shear ok
|
BLD-Foundation | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | PASS |
Tony Young
|
|
|
all foundations complete now
|
BLD-Foundation | 2/26/2016 | 2/29/2016 | 2/29/2016 | A | PART |
Dave Hannah
|
|
|
Pat Phone #: ###-#### upper foundation walls ok to place
|
BLD-Footing | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, poured
|
BLD-Foundation | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, walls on same footings
|
BLD-Footing | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, lower ftgs ok to pour
|
BLD-Conference | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | PART |
Tony Young
|
|
|
Jason-please call 1 hour prior to meet Phone #: ###-####,, met with Contractor and Bob Arnold the soils engineer,, e-mail on how to fix problem and on site evaluation.. can procede with lower footings after cleaning loose mud out and water in lower footings// drain collection designed for any spring water from upper area
|
BLD-Footing | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | FAIL |
Tony Young
|
|
|
Pat Phone #: ###-####,, need to have engineer address the spring water coming into area,, too much water in footing area to pour unless ok'd by engineer
|