BLD-Final | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 6/11/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 6/11/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PART |
Jim Sly
|
|
|
Steve Phone #: ###-#### 2nd floor beam and joists ......OK.
|
BLD-Conference | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | DONE |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
BLD-Final | 9/22/2015 | 9/23/2015 | | A | |
Jim Sly
|
|
|
Steve Phone #: ###-####
|