BLD-Final | 4/15/2016 | 4/18/2016 | 4/18/2016 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Aging Inspection | 2/22/2016 | 2/22/2016 | 2/22/2016 | | NR |
Jim Storey
|
|
|
pending p&z
|
BLD-Aging Inspection | 12/22/2015 | 12/22/2015 | 12/22/2015 | | NR |
Jim Storey
|
|
|
pending p&z
|
BLD-Final | 10/19/2015 | 10/19/2015 | 10/19/2015 | P | PART |
Jim Storey
|
|
|
Jim Phone #: ###-#### tactale signage required/ landscaping in the works with sharh in p&z.
|
BLD-Aging Inspection | 9/16/2015 | 9/16/2015 | 9/16/2015 | | NR |
Jim Storey
|
|
|
no requist for insp.
|
BLD-Final | 7/17/2015 | 7/20/2015 | 7/20/2015 | P | PART |
Dave Hannah
|
|
|
Don Phone #: ###-#### ok for temp occ needs to finish installing door hardwear.ada signage on restrooms and path ada landging at front door
|
FIRE-Final Inspection | 7/17/2015 | 7/20/2015 | 7/20/2015 | A | PASS |
Jim Page
|
|
|
Previously noted items corrected, approved drawings with small documents on site, discharge egress lights installed, Life fire safety passed/complete
|
FIRE-Final Inspection | 7/16/2015 | 7/17/2015 | 7/17/2015 | A | FAIL |
Jim Page
|
|
|
City approved drawings/small documents not on job site, designated exit discharge areas do not have emergency egress illumination, needs to be installed.
|
FIRE-Final Inspection | 7/16/2015 | 7/16/2015 | 7/16/2015 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with project point of conact, John Phone #: ###-####. Flooring being installed, would not have access to areas until flooring done, will reschedule for later date.
|
BLD-Energy code compliance | 6/15/2015 | 6/15/2015 | 6/15/2015 | P | PASS |
Mike Jordan
|
|
|
Insulation // John Phone #: ###-####
|
BLD-Framing/Rough-in | 6/11/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Footing | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|