Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberBLD15-01393
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 9840 W OVERLAND RD
Project NameUnion Square Office Bldg. #2
Customer Number 
ePlanReviewYes
Description
(UNION SQUARE – Office Cold Shell #2) Permit is to construct a new 5,372 square foot office cold shell. This building is not fire sprinklered. Envelope compliance report approved for Slab edge and openings only. No insulation added under this permit. Approval contingent upon adhering to the approved plans on file, Planning Approvals, and attached engineering. Work to include: [construct new poured concrete foundation, wood frame exterior walls, wood truss system], new electrical (exterior lighting only), new exterior stucco system, and related site improvements. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/4/20174/4/20174/4/2017PPASS
DetailsMike Jordan
Follow up "Shell" final inspection now that planning and zoning has signed off on the building shell. Just need final completion cert. Phone #: ###-#### Inspection requested via web by Mike McHargue
DOC - Permit Finaled4/4/20174/4/20174/4/2017PPASS
DetailsMike Jordan
BLD-Final1/23/20171/23/20171/23/2017PPEND
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mike McHargue
FIRE-Final Inspection1/18/20171/18/20171/18/2017PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in11/17/201611/18/201611/18/2016APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance11/17/201611/18/201611/18/2016APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Framing/Rough-in11/16/201611/16/201611/16/2016PPART
DetailsMike Jordan
Shell Framing Phone #: ###-#### Inspection requested via web by Mike McHargue. Work in progress on framing corrections. Air seal complete on exterior walls. ok to insulate.
BLD-Framing/Rough-in11/15/201611/15/201611/15/2016PFAIL
DetailsMike Jordan
Shell Framing Final Phone #: ###-#### Inspection requested via web by Mike McHargue. Complete all lateral bracing. Nail off 2ply B02 truss per the engineering. Provide additional studs underB03 truss, both ends. Provide squash blocks at A13 truss both ends. Install the simpson A34 on all trusses per detail 6 on S1.5. Need electrical rough in inspection and airseal pack on exterior walls. Correction notice was posted.
BLD-Wall Bracing10/24/201610/24/201610/24/2016PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mike McHargue. Exterior shear walls and interior holdowns ok.
BLD-Energy code compliance9/8/20169/9/20169/9/2016PPASS
DetailsMike Jordan
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Foundation9/6/20169/7/20169/7/2016PPASS
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing9/2/20169/6/20169/6/2016PPASS
DetailsMike Jordan
Dane Phone #: ###-####