BLD-Final | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Mike Jordan
|
|
|
Follow up "Shell" final inspection now that planning and zoning has signed off on the building shell. Just need final completion cert. Phone #: ###-#### Inspection requested via web by Mike McHargue
|
DOC - Permit Finaled | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 1/23/2017 | 1/23/2017 | 1/23/2017 | P | PEND |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|
FIRE-Final Inspection | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Framing/Rough-in | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Framing/Rough-in | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | PART |
Mike Jordan
|
|
|
Shell Framing Phone #: ###-#### Inspection requested via web by Mike McHargue. Work in progress on framing corrections. Air seal complete on exterior walls. ok to insulate.
|
BLD-Framing/Rough-in | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | FAIL |
Mike Jordan
|
|
|
Shell Framing Final Phone #: ###-#### Inspection requested via web by Mike McHargue. Complete all lateral bracing. Nail off 2ply B02 truss per the engineering. Provide additional studs underB03 truss, both ends. Provide squash blocks at A13 truss both ends. Install the simpson A34 on all trusses per detail 6 on S1.5. Need electrical rough in inspection and airseal pack on exterior walls. Correction notice was posted.
|
BLD-Wall Bracing | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue. Exterior shear walls and interior holdowns ok.
|
BLD-Energy code compliance | 9/8/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Mike Jordan
|
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Foundation | 9/6/2016 | 9/7/2016 | 9/7/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 9/2/2016 | 9/6/2016 | 9/6/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|