Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-01483
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 3419 E PARSNIP PEAK DR
Project Name8/1 Antelope Springs
Customer Number 
ePlanReviewYes
Description
WUI Zone B, Class A Roof, Permit for the construction of a new 3,070 sq. ft., two story (upper level 2,150 sq. ft., lower level 965 sq. ft.) single family dwelling with 4 bedrooms, 2 and a half bathrooms, approximately 353 sq. ft. of covered patio/porch and a 850 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. C-4D/DA zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/17/20159/18/20159/18/2015APASS
DetailsPhil Shearer
Matt Phone #: ###-####
DOC - Permit Finaled9/18/20159/18/20159/18/2015PPASS
DetailsPhil Shearer
BLD-Final9/17/20159/18/20159/17/2015ACANC
DetailsPhil Shearer
Matt Phone #: ###-####. Add stud in kitchen at oven vent.
BLD-Final9/15/20159/16/20159/16/2015PFAIL
DetailsPhil Shearer
Matt Phone #: ###-####. Handrall 34"-38", steps out of the back of the house can only have 3/8" difference between the steps.
BLD-Framing/Rough-in8/20/20158/21/20158/21/2015ACANC
DetailsPhil Shearer
Matt Phone #: ###-####
BLD-Wall Bracing7/9/20157/10/20157/10/2015APASS
DetailsPhil Shearer
Matt Phone #: ###-####
BLD-Energy code compliance7/7/20157/8/20157/8/2015APASS
DetailsPhil Shearer
Shear // Matt Phone #: ###-####
BLD-Framing/Rough-in7/8/20157/8/20157/8/2015PPASS
DetailsPhil Shearer
Shear // Matt Phone #: ###-####
BLD-Wall Bracing7/7/20157/8/20157/8/2015AFAIL
DetailsPhil Shearer
Shear // Matt Phone #: ###-####
BLD-Framing/Rough-in7/2/20157/6/20157/6/2015PPART
DetailsPhil Shearer
Matt Phone #: ###-#### Missing truss bracing T29 OK to insulate
BLD-Framing/Rough-in6/30/20157/1/20157/1/2015AFAIL
DetailsPhil Shearer
Matt Phone #: ###-####. LVL beam in garage need to have 2 LVL, truss bracing T29, Straps 2nd floor to girder. Shear pony wall, Type 3 hold down, shear nailing.
BLD-Wall Bracing7/1/20157/1/20157/1/2015PFAIL
DetailsPhil Shearer
Matt Phone #: ###-####. Shear nailing and missing hold downs.
BLD-Foundation5/20/20155/21/20155/21/2015APASS
DetailsPhil Shearer
Matt Phone #: ###-####
BLD-Foundation5/20/20155/20/20155/20/2015PNR
DetailsPhil Shearer
Matt Phone #: ###-####
BLD-Footing5/18/20155/19/20155/20/2015APASS
DetailsPhil Shearer
Matt Phone #: ###-####
BLD-Footing5/18/20155/18/20155/18/2015PNR
DetailsPhil Shearer
Phone #: ###-####