BLD-Final | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Jim Storey
|
|
|
Jamal Phone #: ###-####
|
DOC - Permit Finaled | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Jim Storey
|
|
|
per the reviewed plans
|
BLD-Final | 6/29/2016 | 6/29/2016 | 6/29/2016 | P | NR |
Jim Sly
|
|
|
Jamal Phone #: ###-#### No inspection performed. Called Jamal.......Need Zoning final. Not in computer and no card signed.
|
FIRE-Final Inspection | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Jim Page
|
|
|
Previously noted items addressed/repaired. Final life fire safety inspection passed/complete
|
FIRE-Final Inspection | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | FAIL |
Jim Page
|
|
|
Emergency egress light in the corridor was not attached to wall with wires visible, fire extinguishers need to have an inspection performed by a lisenced contractor and a current inspection tag needs to be attached. Audio/visual device on fire alarm system not attached to finished ceiling. Items need to be addressed beofre next inspection.
|
BLD-Framing/Rough-in | 2/3/2016 | 2/5/2016 | 2/5/2016 | A | PART |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
BLD-Footing | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | NR |
Jim Sly
|
|
|
Matt Phone #: ###-#### Need approved plan with all small docs. Special inspection not done. Footing to the South does not match plans.....Engineer to advise. Provide Stamped engineering details if plans are modified.
|
BLD-Foundation | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | CANC |
Jim Sly
|
|
|
Rebar // Matt Phone #: ###-####
|